Automation upgrade - No. 1 blast furnace - US Steel - Edgar Thomson Plant

被引:0
|
作者
Kritikos, RB [1 ]
Bellini, EV [1 ]
机构
[1] US Steel, Mon Valley Works, Pittsburgh, PA 15104 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
All blast furnace relines are inherently challenging from an engineering and construction perspective. As a result, extraordinary detail is required in planning and tracking the work. This is particularly true of the process control system, which is always the last piece of the puzzle to be put in place. U.S. Steel has established an engineering philosophy called Design for Start-up (DFSU) where such planning is a requirement for all projects. Under this philosophy, U.S. Steel brings together a project team that includes the appropriate U.S. Steel personnel and their engineering and construction contractors, all of whom are required to know and buy into the project objectives. The application of this philosophy paid off for the Number 1 Blast Furnace reline at the Fdgar Thomson Plant of Mon Valley Works in the face of some unique challenges.
引用
收藏
页码:2252 / 2256
页数:5
相关论文
共 50 条
  • [1] U.S. steel's Edgar Thomson No. 1 blast furnace reline
    Poole, Thomas H.
    Sloane, Gary P.
    Iron and Steel Engineer, 1999, 76 (06): : 35 - 37
  • [2] Capital repair of blast furnace No. 1 at Visakhapatnam Steel Plant (VSP), India
    Iron and Steelmaker (I and SM), 2001, 28 (03): : 45 - 54
  • [3] Construction of No. 6 blast furnace for BHP steel
    Edwards, Kenneth J.
    Webb, Sydney R.
    Hollins, Stewart
    Iron and Steel Engineer, 1998, 75 (01): : 29 - 33
  • [4] Economic Analysis of an Integrated Steel Plant Equipped with a Blast Furnace or Oxygen Blast Furnace
    Song, Jiayuan
    Jiang, Zeyi
    Zhang, Yongjie
    Han, Zhicheng
    Lu, Yuanxiang
    Dong, Huiyao
    Zhang, Ying
    SUSTAINABILITY, 2023, 15 (15)
  • [5] Iron trough and casthouse refractory upgrade at Inland's No. 7 blast furnace
    Rosenow, Dale C.
    Kahl, Keith R.
    Gaffney, L.J.
    Iron and Steel Engineer, 1988, 65 (10): : 35 - 37
  • [6] BLAST FURNACE OPERATION WITH HIGH PRODUCTIVITY AT KIMITSU NO. 2 BLAST FURNACE OF NIPPON STEEL CORPORATION.
    Yamaguchi, Kazushige
    Ishioka, Nobuo
    Nakayama, Masaaki
    Furukawa, Takashi
    Morii, Kazuyuki
    Endo, Hirohisa
    1600, (25):
  • [7] Intermix trials at the US steel Edgar Thomson works dual-strand caster
    Sinha, AK
    Piccone, TJ
    Daniel, SS
    Alvarez, AH
    85TH STEELMAKING CONFERENCE PROCEEDINGS, 2002, 85 : 261 - 274
  • [8] The blast furnace plant of the Lorain Steel Co. in Lorain
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1901, 45 : 555 - 561
  • [9] REFRACTORY CONSTRUCTION MATERIALS FOR THE BLAST-FURNACE AND STEEL PLANT
    不详
    STAHL UND EISEN, 1994, 114 (05): : 61 - 66
  • [10] Long campaign life of CST No. 1 blast furnace
    Klein, Cristiano Alfredo
    Rezencle, Roney Goncalves
    Fujihara, Fernando Kaoru
    Gushiken, Jorge Lssamu
    REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (06): : S13 - S20