Automation upgrade - No. 1 blast furnace - US Steel - Edgar Thomson Plant

被引:0
|
作者
Kritikos, RB [1 ]
Bellini, EV [1 ]
机构
[1] US Steel, Mon Valley Works, Pittsburgh, PA 15104 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
All blast furnace relines are inherently challenging from an engineering and construction perspective. As a result, extraordinary detail is required in planning and tracking the work. This is particularly true of the process control system, which is always the last piece of the puzzle to be put in place. U.S. Steel has established an engineering philosophy called Design for Start-up (DFSU) where such planning is a requirement for all projects. Under this philosophy, U.S. Steel brings together a project team that includes the appropriate U.S. Steel personnel and their engineering and construction contractors, all of whom are required to know and buy into the project objectives. The application of this philosophy paid off for the Number 1 Blast Furnace reline at the Fdgar Thomson Plant of Mon Valley Works in the face of some unique challenges.
引用
收藏
页码:2252 / 2256
页数:5
相关论文
共 50 条
  • [21] The blast-furnace plant of the Illnois Steel Company in Joliet, III.
    Frolich, F
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1907, 51 : 540 - 543
  • [22] Operation of blast-furnace plant of Columbia Steel Corpn at Ironton, Utah
    Phibbs, WR
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1928, 80 : 62 - 65
  • [23] BLAST FURNACE TAR INJECTION EXPERIENCE - BETHLEHEM PLANT, BETHLEHEM STEEL CORP
    VANKEURE.JW
    JOURNAL OF METALS, 1971, 23 (03): : 16 - &
  • [24] Comprehensive analysis of corrosion failure of blast furnace gas pipeline in a steel plant
    Chen, Tianqi
    Sun, Liang
    Li, Qing
    Liu, Chao
    Liu, Zhiyong
    Cheng, Xuequn
    Li, Xiaogang
    ENGINEERING FAILURE ANALYSIS, 2023, 154
  • [25] Using spool piece thermocouples and finite element analysis to determine the taphole condition at the US Steel Gary Works No. 13 Blast Furnace
    Radakovic, DJ
    Zhao, Y
    Entwistle, JW
    60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 903 - 910
  • [26] PULVERIZED COAL INJECTION INTO NO. 1 BLAST FURNACE AT OITA WORKS.
    Kawabe, Masayuki
    Wakuri, Shinjiro
    Baba, Masaki
    Ishikawa, Yasushi
    Hasegawa, Akira
    Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan, 1982, 68 (15): : 2393 - 2398
  • [27] Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works
    Kurita, Y
    Morizane, Y
    Noguchi, S
    Kurihara, K
    Ogata, I
    Terada, Y
    REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2000, 97 (7-8): : 887 - 896
  • [28] ANALYSIS OF THE SERVICE OF THE HOT BLAST AIR LINE OF NO. 9 BLAST FURNACE OF KRIVOI ROG STEEL METALLURGICAL COMBINE.
    Starshinov, B.N.
    Bulakh, V.L.
    Azarenkova, L.E.
    Pitak, N.V.
    Refractories (English translation of Ogneupory), 1986, 27 (9-10): : 549 - 555
  • [29] Ladle furnace automation at the Vitkovice basic oxygen steel plant and electric melt shop
    Arnreiter, D
    Muller, J
    Minar, M
    STAHL UND EISEN, 1997, 117 (04): : 85 - 89
  • [30] THE PHYSICAL PROPERTIES OF THE BLAST FURNACE SLAG AND STEEL PLANT SLAG USED IN ROAD CONSTRUCTION
    Vilciu, Irina
    METALURGIA INTERNATIONAL, 2013, 18 : 126 - 130