Automation upgrade - No. 1 blast furnace - US Steel - Edgar Thomson Plant

被引:0
|
作者
Kritikos, RB [1 ]
Bellini, EV [1 ]
机构
[1] US Steel, Mon Valley Works, Pittsburgh, PA 15104 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
All blast furnace relines are inherently challenging from an engineering and construction perspective. As a result, extraordinary detail is required in planning and tracking the work. This is particularly true of the process control system, which is always the last piece of the puzzle to be put in place. U.S. Steel has established an engineering philosophy called Design for Start-up (DFSU) where such planning is a requirement for all projects. Under this philosophy, U.S. Steel brings together a project team that includes the appropriate U.S. Steel personnel and their engineering and construction contractors, all of whom are required to know and buy into the project objectives. The application of this philosophy paid off for the Number 1 Blast Furnace reline at the Fdgar Thomson Plant of Mon Valley Works in the face of some unique challenges.
引用
收藏
页码:2252 / 2256
页数:5
相关论文
共 50 条
  • [41] Installation of a low purity oxygen plant for blast furnace injection at LTV Steel Cleveland Works
    Doraski, JS
    Varney, DW
    Pintz, RH
    60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 261 - 267
  • [42] Injection of solid biomass products into the blast furnace and its potential effects on an integrated steel plant
    Wang, Chuan
    Larsson, Mikael
    Lovgren, Jonas
    Nilsson, Leif
    Mellin, Pelle
    Yang, Weihong
    Salman, Hassan
    Hultgren, Anders
    INTERNATIONAL CONFERENCE ON APPLIED ENERGY, ICAE2014, 2014, 61 : 2184 - 2187
  • [43] Campaigns and relines of blast furnace no 1 at the Oita steelworks of Nippon Steel Corp
    Mochizuki, S
    Morishita, N
    Higuchi, M
    Misawa, J
    STAHL UND EISEN, 1996, 116 (12): : 83 - &
  • [44] Pressing, cooling and coiling - China steel HSM No. 1 major upgrade project
    Filipczyk, Wlodzimierz
    Lin, Chen-Hua
    Iron and Steel Technology, 2007, 4 (05): : 309 - 311
  • [45] MADELINE GOES COLD OR FREEZE-UP AND RECOVERY OF INLANDS NO. 1 BLAST FURNACE
    NEWELL, JL
    REIMER, J
    BLAST FURNACE AND STEEL PLANT, 1970, 58 (07): : 476 - &
  • [46] Results of studying the physical properties of blast-furnace slags at the Il'ich Integrated Steel Plant
    Bachinin, AA
    Nesterenko, SV
    Bachinina, GA
    Botman, SV
    Khrushchev, EI
    STEEL IN TRANSLATION, 1996, 26 (10) : 6 - 12
  • [47] SUMMARY OF THE SECOND TEST ON REGULAR LAYER FILLING IN BLAST FURNACE No. 3 OF WUHAN IRON AND STEEL COMPANY.
    Liu Chi
    Kang T'ieh/Iron and Steel (Peking), 1983, 18 (01): : 1 - 6
  • [48] OPERATION FOR PRODUCING THE PIG IRON WITH OPTIMUM QUALITIES AT KIMITSU NO. 2 BLAST FURNACE OF NIPPON STEEL CORPORATION.
    Yamaguchi, Kazushige
    Yamaguchi, Kazuyoshi
    Nakayama, Masayuki
    Morii, Kazuyuki
    Nagata, Shunsuke
    Kutsuzawa, Shigeru
    Transactions of the Iron and Steel Institute of Japan, 1986, 26 (11)
  • [49] Shell strength analysis by finite element method for No. 11 blast furnace at Anshan Iron and Steel Co.
    Zhang, Dechen
    Zhang, Shuyi
    Su, He
    Lu, Fuxing
    Dong, Guoliang
    Han, Erzhong
    Kang T'ieh/Iron and Steel (Peking), 1992, 27 (05): : 6 - 9
  • [50] Improvement in relining design of No.1 blast furnace at Baoshan Iron and Steel Corp
    Wang, Zemin
    Kang T'ieh/Iron and Steel (Peking), 1998, 33 (03): : 1 - 4