共 50 条
- [1] PULVERIZED COAL INJECTION INTO NO. 1 BLAST FURNACE AT OITA WORKS. Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan, 1982, 68 (15): : 2393 - 2398
- [2] CONSTRUCTION AND OPERATION OF NO. 5 BLAST FURNACE, FUKUYAMA WORKS, NIPPON KOKAN KK. Ironmaking and Steelmaking, 1976, 3 (05): : 241 - 251
- [3] Analysis of No. 3 blast furnace operation of TangGang works at China based on rist diagram TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 2003, 89 (02): : 99 - 104
- [4] Interim repair of the Lake Erie works' No. blast furnace Iron and Steel Engineer, 1990, 67 (06):
- [5] Stabilization and performance of the No. 4 blast furnace bosh AISE Steel Technology, 2003, 80 (05): : 60 - 66
- [6] Short term revamping of No. 6 blast furnace in Chiba Works REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1999, 96 (03): : 349 - 357
- [7] CONTROL SYSTEM OF NO. 7 BLAST FURNACE AT ALGOMA AND RELATIONSHIP TO FURNACE OPERATION. Iron and Steel Engineer, 1979, 56 (03): : 57 - 70
- [9] Burden distribution studies for Gary No. 4 blast furnace 60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 57 - 69
- [10] Relining and enlargement of Rogesa No. 4 blast furnace in 2003 REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2005, 102 (7-8): : 517 - 524