- [21] BURDEN DISTRIBUTION IN NO. 1 BLAST FURNACE OF ITALSIDER TARANTO WORKS UTILIZING THE BELL-LESS TOP. Ironmaking and Steelmaking, 1980, 7 (01): : 13 - 24
- [23] Relining, upgrading and improved environmental conditions of Rogesa's blast furnace No. 4 STAHL UND EISEN, 2006, 126 (01): : 55 - 62
- [24] Capital repair of blast furnace No. 1 at Visakhapatnam Steel Plant (VSP), India Iron and Steelmaker (I and SM), 2001, 28 (03): : 45 - 54
- [25] Automation upgrade - No. 1 blast furnace - US Steel - Edgar Thomson Plant CONFERENCE RECORD OF THE 1998 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-3, 1998, : 2252 - 2256
- [26] Performance of a multi-junction radial thermocouple on blast furnace No. 1 in 2005 Metallurgist, 2007, 51 : 145 - 147
- [28] MADELINE GOES COLD OR FREEZE-UP AND RECOVERY OF INLANDS NO. 1 BLAST FURNACE BLAST FURNACE AND STEEL PLANT, 1970, 58 (07): : 476 - &
- [29] DEVELOPMENT OF THE SAKAI WORKS NO. 2 BLAST FURNACE COMPUTER CONTROL SYSTEM AND ITS APPLICATION TO PRACTICAL OPERATIONS. Nippon Steel Technical Report, 1977, (10): : 66 - 77
- [30] Investigation of non-uniform material distribution of top charging system at Gary Works No. 13 blast furnace 60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 23 - 35