Speedy switchover of operation from Tobata No. 1 to No. 4 blast furnace at Yawata Works

被引:0
|
作者
Kurita, Y [1 ]
Morizane, Y [1 ]
Noguchi, S [1 ]
Kurihara, K [1 ]
Ogata, I [1 ]
Terada, Y [1 ]
机构
[1] NSC Yawata Works, Yawata, Japan
关键词
D O I
10.1051/metal/200097070887
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Nippon Steel Yawata Works operates with only one blast furnace in service. BF No. 1 (inner volume : 4407 m(3)) was blown off on January 31, 1998 after operating for thirteen years. The third campaign of BF No. 4 (inner volume : 4250 m(3)) was started the following day and productivity reached 2.0 t/d(.)m(3) IV after fifteen days of operation. This paper describes the characteristics of the relining of No. 4 furnace. Also presented is the background of the speedy switchover of large blast furnace operation and the rapid increase in productivity without any reduction in output.
引用
收藏
页码:887 / 896
页数:10
相关论文
共 50 条
  • [41] State of Katowice Steelworks No. 1 Blast Furnace Shaft after the First Campaign During the Period 1976-1981.
    Piekutowski, Zbigniew
    Jurga, Zdzislaw
    Radwan, Leszek
    1600, (50):
  • [42] Investigation of the Hearth Erosion of WISCO No. 1 Blast Furnace Based on the Numerical Analysis of Iron Flow and Heat Transfer in the Hearth
    Ni, Ao
    Li, Chengzhi
    Zhang, Wei
    Xiao, Zhixin
    Liu, Dongliang
    Xue, Zhengliang
    METALS, 2022, 12 (05)
  • [43] DETERMINATION OF COKE CONSUMPTION IN BLAST-FURNACE OPERATION FROM THE HEARTH TEMPERATURE .1.
    BABARYKIN, NN
    ROGOZHNIKOV, SP
    KARTASHOV, AV
    STEEL IN THE USSR, 1986, 16 (12): : 577 - 579
  • [44] PULVERIZED COAL INJECTION EQUIPMENT AND BLAST-FURNACE OPERATION AT NO-1-BF, NAKAYAMA-STEEL-WORKS-LTD
    KUMADA, T
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S869 - S869
  • [45] DETERMINATION OF COKE CONSUMPTION IN BLAST FURNACE OPERATION FROM THE HEARTH TEMPERATURE. COMMUNICATION 1.
    Babarykin, N.N.
    Rogozhnikov, S.P.
    Kartashov, A.V.
    Steel in the USSR, 1987, 16 (12): : 577 - 579
  • [46] Feliks Nowowiejs']jski, Complete works for organ, vol 1, Symphonies No. 2 and 8, Concerto No. 4 - Fundacja-Festival-Muzyki-Sakralnej (Erdmann)
    Stockmeier, W
    MUSIK UND KIRCHE, 2001, 71 (01): : 55 - 56
  • [47] USE OF FORMED-COKE AT BLAST-FURNACE .2. EVALUATION OF OPERATION RESULTS DURING USE OF FORMED-COKE AT TOBATA NO-4 BF OF NIPPON-STEEL-CORP
    OKUDA, K
    TOKUNAGA, M
    NOMIYA, Y
    MIWA, T
    KURIHARA, K
    SAITOH, K
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1988, 28 (03) : B84 - B84
  • [48] USE OF FORMED-COKE AT BLAST-FURNACE .1. OUTLINE OF THE TRIAL USE OF FORMED-COKE AT TOBATA NO-4 BF OF NIPPON-STEEL-CORP
    OKUDA, K
    TERADA, Y
    NOMIYA, Y
    ASAI, K
    KURIHARA, K
    KANAMORI, T
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1988, 28 (03) : B83 - B83
  • [49] Construction of new stainless steelmaking shop with highly flexible raw material choice: construction and operation of no. 4 steelmaking shop at Chiba Works
    Nabeshima, Yuki
    Ogura, Shigeru
    Yamada, Sumio
    Kawasaki Steel Technical Report, 1997, (37): : 42 - 50
  • [50] PSA System for the Recovery of Carbon Dioxide from Blast Furnace Gas in Steel Works The Influence of Operation Conditions on CO2 Separation
    Haraoka, Takashi
    Mogi, Yasuhiro
    Saima, Hitoshi
    KAGAKU KOGAKU RONBUNSHU, 2013, 39 (05) : 439 - 444