共 50 条
- [1] Automation upgrade - No. 1 blast furnace - US Steel - Edgar Thomson Plant CONFERENCE RECORD OF THE 1998 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-3, 1998, : 2252 - 2256
- [3] Modernization and reline of Hoogovens' No. 7 blast furnace Iron and Steel Engineer, 1994, 71 (10): : 29 - 36
- [4] A Bethlehem steel change in reline strategy for "L" Blast Furnace 60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 843 - 864
- [5] Thomson cautious on U.S. defense links Aviation Week and Space Technology (New York), 2000, 153 (05):
- [9] Construction of No. 6 blast furnace for BHP steel Iron and Steel Engineer, 1998, 75 (01): : 29 - 33
- [10] No.1 blast furnace: Operating experience since the 1996 reline 60TH IRONMAKING CONFERENCE PROCEEDINGS, 2001, 60 : 375 - 381