Iron trough and casthouse refractory upgrade at Inland's No. 7 blast furnace

被引:0
|
作者
Rosenow, Dale C. [1 ]
Kahl, Keith R. [1 ]
Gaffney, L.J. [1 ]
机构
[1] Inland Steel Co, United States
来源
Iron and Steel Engineer | 1988年 / 65卷 / 10期
关键词
Productivity;
D O I
暂无
中图分类号
学科分类号
摘要
Inland's No. 7 blast furnace has a 13.7 metre (45 ft) hearth dia and an inner volume of 4403 cu metres (155,470 cu ft). It is belt charged and has a bell-less top. The furnace is equipped with three hot blast stoves, four tapholes and an expansion turbine. During the first campaign, the highest quarterly productivity was 7240 tons/day. Currently, the furnace is averaging 7750 tons/day. The change that contributed to this productivity increase was the use of fluxed pellets in the burden. Service life of the casthouse iron trough and runner system has been improved by a redesign of the trough box. New design features include natural draft cooling together with an andalusite-based backup lining.
引用
收藏
页码:35 / 37
相关论文
共 50 条
  • [1] Blast furnace casthouse refractory maintenance optimization
    Hilberg, Jeff
    Walnoha, David V.
    Iron and Steel Technology, 2015, 12 (09): : 77 - 82
  • [2] Maintaining casting performance and the continuous improvement process at Ispat Inland's No. 7 blast furnace
    Black, B.
    Bobek, J.
    Iron and Steelmaker (I and SM), 2003, 30 (08): : 107 - 111
  • [3] CHALLENGES OF BLAST FURNACE CASTHOUSE: FAILURE ANALYSIS OF MAIN RUNNER REFRACTORY CASTABLE
    Domiciano, V. G.
    Ollmann, A. R.
    Clemente, E. I.
    Duarte, A. K.
    Brito, M. A. M.
    PROCEEDINGS OF THE UNIFIED INTERNATIONAL TECHNICAL CONFERENCE ON REFRACTORIES (UNITECR 2013), 2014, : 553 - 558
  • [4] BLAST-FURNACE CASTHOUSE TROUGH AND RUNNER REFRACTORIES - AN OFF-THE-RECORD PANEL DISCUSSION
    BRENNERMAN, RG
    SNYDER, BJ
    COLINS, J
    FISCHLEY, J
    SPIRKO, EJ
    THRASHER, EL
    YOUNT, J
    IRON AND STEEL ENGINEER, 1983, 60 (09): : P95 - P95
  • [5] SEPARATION OF PIG IRON AND SLAG IN BLAST FURNACE TROUGH.
    Vertsman, G.M.
    Andronov, V.N.
    Shestopalov, I.I.
    Dudko, G.F.
    1985, (15):
  • [6] COMPUTER CONTROL AT THE INLAND NO-7 BLAST-FURNACE
    FURLAN, TM
    IRON AND STEEL ENGINEER, 1983, 60 (09): : P37 - P37
  • [7] COMPUTER CONTROL AT THE INLAND NO-7 BLAST-FURNACE
    FURLAN, TM
    IRON AND STEEL ENGINEER, 1983, 60 (07): : 77 - 77
  • [8] Modernization and reline of Hoogovens' No. 7 blast furnace
    Noort, Nico
    Ruoff, Jeroen
    Schmidt, Kees
    Stolwijk, Cornelis
    van Stralen, Jan
    Iron and Steel Engineer, 1994, 71 (10): : 29 - 36
  • [9] SEPARATION OF PIG-IRON AND SLAG IN BLAST-FURNACE TROUGH
    VERTSMAN, GM
    ANDRONOV, VN
    SHESTOPALOV, II
    DUDKO, GF
    STEEL IN THE USSR, 1985, 15 (11): : 519 - 520
  • [10] Automation upgrade - No. 1 blast furnace - US Steel - Edgar Thomson Plant
    Kritikos, RB
    Bellini, EV
    CONFERENCE RECORD OF THE 1998 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-3, 1998, : 2252 - 2256