Iron trough and casthouse refractory upgrade at Inland's No. 7 blast furnace

被引:0
|
作者
Rosenow, Dale C. [1 ]
Kahl, Keith R. [1 ]
Gaffney, L.J. [1 ]
机构
[1] Inland Steel Co, United States
来源
Iron and Steel Engineer | 1988年 / 65卷 / 10期
关键词
Productivity;
D O I
暂无
中图分类号
学科分类号
摘要
Inland's No. 7 blast furnace has a 13.7 metre (45 ft) hearth dia and an inner volume of 4403 cu metres (155,470 cu ft). It is belt charged and has a bell-less top. The furnace is equipped with three hot blast stoves, four tapholes and an expansion turbine. During the first campaign, the highest quarterly productivity was 7240 tons/day. Currently, the furnace is averaging 7750 tons/day. The change that contributed to this productivity increase was the use of fluxed pellets in the burden. Service life of the casthouse iron trough and runner system has been improved by a redesign of the trough box. New design features include natural draft cooling together with an andalusite-based backup lining.
引用
收藏
页码:35 / 37
相关论文
共 50 条
  • [41] Study on Corrosion Resistance of S-Carbon Bricks for Blast Furnace Hearth in Molten Iron
    Shi, Huangyu
    Wang, Cui
    Zong, Yanbing
    Liu, Yanxiang
    Wang, Zhongyi
    Zhang, Jianliang
    METALS, 2023, 13 (07)
  • [42] Investigation of the Hearth Erosion of WISCO No. 1 Blast Furnace Based on the Numerical Analysis of Iron Flow and Heat Transfer in the Hearth
    Ni, Ao
    Li, Chengzhi
    Zhang, Wei
    Xiao, Zhixin
    Liu, Dongliang
    Xue, Zhengliang
    METALS, 2022, 12 (05)
  • [43] INVESTIGATION AND PRACTICE OF STOCK DISTRIBUTION WITH THE BELL-LESS TOP OF THE NO. 2 BLAST FURNACE OF THE SHOUDU IRON AND STEEL CO.
    Qian Renyi
    Chen Xiaoquan
    Kang T'ieh/Iron and Steel (Peking), 1981, 16 (07): : 56 - 65
  • [44] Optimal tracking control for blast furnace molten iron quality based on subspace identification and Krotov's method
    Liu, Yue
    Zhou, Ping
    OPTIMAL CONTROL APPLICATIONS & METHODS, 2023, 44 (05): : 2532 - 2550
  • [45] Material Composition and Microstructure of Ceramic Stack and Hearth of JSC EVRAZ NTMK Blast Furnace No. 6 After Service. Refractory Microstructure After Service
    V. A. Perepelitsyn
    K. G. Zemlyanoi
    K. V. Mironov
    A. A. Forshev
    F. P. Nikolaev
    D. V. Sushnikov
    Refractories and Industrial Ceramics, 2023, 64 : 1 - 5
  • [46] Optimal Tracking Control of Blast Furnace Molten Iron Quality Based on Krotov's Method and Nonlinear Subspace Identification
    Liu, Yue
    Zhou, Ping
    Sun, Xiaoyang
    Chai, Tianyou
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2024, 71 (08) : 9610 - 9619
  • [47] A Novel MIMO T-S Fuzzy Modeling for Prediction of Blast Furnace Molten Iron Quality With Missing Outputs
    Li, Junpeng
    Hua, Changchun
    Yang, Yana
    Guan, Xinping
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2021, 29 (06) : 1654 - 1666
  • [48] Formation of Hearth Sediment during Vanadium Titano-magnetite Smelting in Blast Furnace No.7 of Chengde Iron and Steel Company
    Liu, Xiao-jie
    Lu, Qing
    Chen, Shu-jun
    Zhang, Zhen-feng
    Zhang, Shu-hui
    Sun, Yan-qin
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2015, 22 (11) : 1009 - 1014
  • [49] Formation of Hearth Sediment during Vanadium Titano-magnetite Smelting in Blast Furnace No.7 of Chengde Iron and Steel Company
    Xiao-jie LIU
    Qing Lü
    Shu-jun CHEN
    Zhen-feng ZHANG
    Shu-hui ZHANG
    Yan-qin SUN
    Journal of Iron and Steel Research(International), 2015, 22 (11) : 1009 - 1014
  • [50] Formation of Hearth Sediment during Vanadium Titano-magnetite Smelting in Blast Furnace No.7 of Chengde Iron and Steel Company
    Xiao-jie Liu
    Qing Lü
    Shu-jun Chen
    Zhen-feng Zhang
    Shu-hui Zhang
    Yan-qin Sun
    Journal of Iron and Steel Research International, 2015, 22 : 1009 - 1014