Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling

被引:44
|
作者
Liu, Dian [1 ]
Li, Heng [2 ]
Wang, Hongwei [3 ]
Qi, Chao [3 ]
Rose, Timothy [4 ]
机构
[1] Shanghai Univ, SILC Business Sch, 20 Chengzhong Rd, Shanghai 201800, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Hong Kong, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Management, Wuhan 430074, Peoples R China
[4] Queensland Univ Technol, Sci & Engn Fac, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
基金
中国国家自然科学基金;
关键词
Large-scale construction project; Deadline constraint; Time-cost trade-off; Discrete symbiotic organisms search; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM;
D O I
10.1016/j.eswa.2020.113230
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Construction projects are becoming increasingly larger and more complex in terms of size and cost. An optimization tool is necessary for the construction management system to develop the desired construction schedule to save time and cost. However, only a few efforts have been made to deal with the time-cost trade-off problem (TCTP) in the large-scale construction projects, and the existing optimization methods are slightly limited by the trouble of parameter tuning. As TCTP is known to be an NP-hard problem, this paper aims to introduce a new variant of Symbiotic Organisms Search (SOS) algorithm that does not contain control parameters, called DSOS (Discrete Symbiotic Organisms Search) which generates the parasite organism using a heuristic rule based on the network levels. This enhancement helps to improve the exploration phase and avoid premature stagnation. Performances are evaluated on project instances with different numbers of activities varying from 180 to 6300, as well as nine newly generated project instances with 720 activities but different network structures. The obtained results show a good performance of DSOS in terms of robustness and deviation from optimum in comparison with other meta-heuristics and variants of DSOS without using the heuristic rule. The good performance implies that DSOS is sufficient to serve as an effective tool to generate an optimized construction schedule. (C) 2020 Published by Elsevier Ltd.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] On the discrete time, cost and quality trade-off problem
    Tareghian, Hamed R.
    Taheri, Seyyed Hassan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 181 (02) : 1305 - 1312
  • [42] Time-cost trade-off in a multi-choice assignment problem
    Singh, Shalabh
    Singh, Sonia
    ENGINEERING OPTIMIZATION, 2022, 54 (04) : 576 - 592
  • [43] A fuzzy time-cost trade-off problem with credibility theory concepts
    Ke, Hua
    Ma, Weimin
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 258 - 262
  • [44] SOLVING FUZZY TIME-COST TRADE-OFF PROBLEM USING HAAR CRITICAL PATH METHOD OF OCTAGONAL FUZZY NUMBERS
    Rameshan, N.
    Dinagar, D. Stephen
    ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2021, 21 (02): : 907 - 922
  • [45] Time-cost trade-off analysis of a priority based assignment problem
    Kaur, Prabhjot
    Dahiya, Kalpana
    Verma, Vanita
    OPSEARCH, 2021, 58 (02) : 448 - 482
  • [46] A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    Ranjbar, Mohammad
    De Reyck, Bert
    Kianfar, Fereydoon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (01) : 35 - 48
  • [47] Time-cost trade-off analysis of a priority based assignment problem
    Prabhjot Kaur
    Kalpana Dahiya
    Vanita Verma
    OPSEARCH, 2021, 58 : 448 - 482
  • [48] A New Multiobjective Time-Cost Trade-Off for Scheduling Maintenance Problem in a Series-Parallel System
    Tavassoli, Leyla Sadat
    Massah, Reza
    Montazeri, Arsalan
    Mirmozaffari, Mirpouya
    Jiang, Guang-Jun
    Chen, Hong-Xia
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [49] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [50] Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer
    Zou, Haobo
    Zhou, Guohua
    JOURNAL OF INTERNET TECHNOLOGY, 2021, 22 (01): : 197 - 207