Discrete symbiotic organisms search method for solving large-scale time-cost trade-off problem in construction scheduling

被引:44
|
作者
Liu, Dian [1 ]
Li, Heng [2 ]
Wang, Hongwei [3 ]
Qi, Chao [3 ]
Rose, Timothy [4 ]
机构
[1] Shanghai Univ, SILC Business Sch, 20 Chengzhong Rd, Shanghai 201800, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hung Hom, Hong Kong, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Management, Wuhan 430074, Peoples R China
[4] Queensland Univ Technol, Sci & Engn Fac, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
基金
中国国家自然科学基金;
关键词
Large-scale construction project; Deadline constraint; Time-cost trade-off; Discrete symbiotic organisms search; GENETIC ALGORITHM; OPTIMIZATION ALGORITHM;
D O I
10.1016/j.eswa.2020.113230
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Construction projects are becoming increasingly larger and more complex in terms of size and cost. An optimization tool is necessary for the construction management system to develop the desired construction schedule to save time and cost. However, only a few efforts have been made to deal with the time-cost trade-off problem (TCTP) in the large-scale construction projects, and the existing optimization methods are slightly limited by the trouble of parameter tuning. As TCTP is known to be an NP-hard problem, this paper aims to introduce a new variant of Symbiotic Organisms Search (SOS) algorithm that does not contain control parameters, called DSOS (Discrete Symbiotic Organisms Search) which generates the parasite organism using a heuristic rule based on the network levels. This enhancement helps to improve the exploration phase and avoid premature stagnation. Performances are evaluated on project instances with different numbers of activities varying from 180 to 6300, as well as nine newly generated project instances with 720 activities but different network structures. The obtained results show a good performance of DSOS in terms of robustness and deviation from optimum in comparison with other meta-heuristics and variants of DSOS without using the heuristic rule. The good performance implies that DSOS is sufficient to serve as an effective tool to generate an optimized construction schedule. (C) 2020 Published by Elsevier Ltd.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [32] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [33] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [34] Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    Hazir, Oencue
    Haouari, Mohamed
    Erel, Erdal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (02) : 633 - 643
  • [35] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [36] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [37] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
  • [38] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [39] Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
    Ranjbar, Mohammad R.
    Kianfar, Fereydoon
    APPLIED MATHEMATICS AND COMPUTATION, 2007, 191 (02) : 451 - 456
  • [40] A FLOW-PRESERVING ALGORITHM FOR THE TIME-COST TRADE-OFF PROBLEM
    TUFEKCI, S
    IIE TRANSACTIONS, 1982, 14 (02) : 109 - 113