A New Multiobjective Time-Cost Trade-Off for Scheduling Maintenance Problem in a Series-Parallel System

被引:4
|
作者
Tavassoli, Leyla Sadat [1 ]
Massah, Reza [2 ]
Montazeri, Arsalan [3 ]
Mirmozaffari, Mirpouya [1 ]
Jiang, Guang-Jun [4 ,5 ]
Chen, Hong-Xia [4 ,5 ]
机构
[1] Univ Texas Arlington, Dept Ind Mfg & Syst Engn, Arlington, TX 76019 USA
[2] Univ Texas Arlington, Dept Civil Engn, Arlington, TX 76019 USA
[3] Univ Isfahan, Dept Chem Engn, Esfahan, Iran
[4] Inner Mongolia Univ Technol, Sch Mech Engn, Hohhot 010051, Inner Mongolia, Peoples R China
[5] Inner Mongolia Key Lab Adv Mfg Technol, Hohhot 010051, Inner Mongolia, Peoples R China
基金
中国国家自然科学基金;
关键词
BI-OBJECTIVE OPTIMIZATION; EXTREME LEARNING-MACHINE; MODIFIED NSGA-II; DIAGNOSIS; STUDENTS; MODEL; ALGORITHM; SELECTION;
D O I
10.1155/2021/5583125
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a modified model of Nondominated Sorting Genetic Algorithm 2 (NSGA-II), which is one of the Multiobjective Evolutionary Algorithms, is proposed. This algorithm is a new model designed to make a trade-off between minimizing the cost of preventive maintenance (PM) and minimizing the time taken to perform this maintenance for a series-parallel system. In this model, the limitations of labor and equipment of the maintenance team and the effects of maintenance issues on manufacturing problems are also considered. In the mathematical model, finding the appropriate objective functions for the maintenance scheduling problem requires all maintenance costs and failure rates to be integrated. Additionally, the effects of production interruption during preventive maintenance are added to objective functions. Furthermore, to make a better performance compared with a regular NSGA-II algorithm, we proposed a modified algorithm with a repository to keep more unacceptable solutions. These solutions can be modified and changed with the proposed mutation algorithm to acceptable solutions. In this algorithm, modified operators, such as simulated binary crossover and polynomial mutation, will improve the algorithm to generate convergence and uniformly distributed solutions with more diverse solutions. Finally, by comparing the experimental solutions with the solutions of two Strength Pareto Evolutionary Algorithm 2 (SPEA2) and regular NSGA-II, MNSGA-II generates more efficient and uniform solutions than the other two algorithms.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [2] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [3] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [4] A GENERALIZED TIME-COST TRADE-OFF TRANSPORTATION PROBLEM
    PRASAD, VR
    NAIR, KPK
    ANEJA, YP
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (12) : 1243 - 1248
  • [5] TIME-COST TRADE-OFF IN A SOLID TRANSPORTATION PROBLEM
    BHATIA, HL
    PURI, MC
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1977, 57 (10): : 616 - 619
  • [6] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [7] Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling
    Bettemir, Onder Halis
    Yucel, Tugay
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (02) : 293 - 309
  • [8] TIME-COST TRADE-OFF FOR AIRLINERS
    HARTLEY, K
    CORCORAN, W
    JOURNAL OF INDUSTRIAL ECONOMICS, 1978, 26 (03): : 209 - 222
  • [9] MULTIOBJECTIVE RELIABILITY AND REDUNDANCY OPTIMIZATION OF A SERIES-PARALLEL SYSTEM BY SURROGATE WORTH TRADE-OFF METHOD
    SAKAWA, M
    MICROELECTRONICS AND RELIABILITY, 1978, 17 (04): : 465 - 467
  • [10] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):