A New Multiobjective Time-Cost Trade-Off for Scheduling Maintenance Problem in a Series-Parallel System

被引:4
|
作者
Tavassoli, Leyla Sadat [1 ]
Massah, Reza [2 ]
Montazeri, Arsalan [3 ]
Mirmozaffari, Mirpouya [1 ]
Jiang, Guang-Jun [4 ,5 ]
Chen, Hong-Xia [4 ,5 ]
机构
[1] Univ Texas Arlington, Dept Ind Mfg & Syst Engn, Arlington, TX 76019 USA
[2] Univ Texas Arlington, Dept Civil Engn, Arlington, TX 76019 USA
[3] Univ Isfahan, Dept Chem Engn, Esfahan, Iran
[4] Inner Mongolia Univ Technol, Sch Mech Engn, Hohhot 010051, Inner Mongolia, Peoples R China
[5] Inner Mongolia Key Lab Adv Mfg Technol, Hohhot 010051, Inner Mongolia, Peoples R China
基金
中国国家自然科学基金;
关键词
BI-OBJECTIVE OPTIMIZATION; EXTREME LEARNING-MACHINE; MODIFIED NSGA-II; DIAGNOSIS; STUDENTS; MODEL; ALGORITHM; SELECTION;
D O I
10.1155/2021/5583125
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a modified model of Nondominated Sorting Genetic Algorithm 2 (NSGA-II), which is one of the Multiobjective Evolutionary Algorithms, is proposed. This algorithm is a new model designed to make a trade-off between minimizing the cost of preventive maintenance (PM) and minimizing the time taken to perform this maintenance for a series-parallel system. In this model, the limitations of labor and equipment of the maintenance team and the effects of maintenance issues on manufacturing problems are also considered. In the mathematical model, finding the appropriate objective functions for the maintenance scheduling problem requires all maintenance costs and failure rates to be integrated. Additionally, the effects of production interruption during preventive maintenance are added to objective functions. Furthermore, to make a better performance compared with a regular NSGA-II algorithm, we proposed a modified algorithm with a repository to keep more unacceptable solutions. These solutions can be modified and changed with the proposed mutation algorithm to acceptable solutions. In this algorithm, modified operators, such as simulated binary crossover and polynomial mutation, will improve the algorithm to generate convergence and uniformly distributed solutions with more diverse solutions. Finally, by comparing the experimental solutions with the solutions of two Strength Pareto Evolutionary Algorithm 2 (SPEA2) and regular NSGA-II, MNSGA-II generates more efficient and uniform solutions than the other two algorithms.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model
    Panwar, Abhilasha
    Jha, Kumar Neeraj
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [22] A New Idea to LP Model for Time-cost Trade-off in Networks
    ZHAO Guohao
    JING Shentu and ZHANG Yaguang(Scanxi Institute of Economic Management
    Journal of Systems Science and Systems Engineering, 1995, (03) : 250 - 255
  • [23] Time-Cost Trade-Off Optimization with a New Initial Population Approach
    Togan, Vedat
    Eirgas, Mohammad Azim
    TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580
  • [24] Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
    Anagnostopoulos, K. P.
    Kotsikas, L.
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (01) : 260 - 270
  • [25] Network analysis algorithm for the solution of discrete time-cost trade-off problem
    Önder Halis Bettemir
    M. Talat Birgönül
    KSCE Journal of Civil Engineering, 2017, 21 : 1047 - 1058
  • [26] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [27] Solution of discrete time-cost trade-off problem with adaptive search domain
    Bettemir, Onder Halis
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025, 32 (02) : 1032 - 1052
  • [28] Time-cost trade-off optimization with a new initial population approach
    Toğan V.
    Eirgash M.A.
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580
  • [29] Stochastic construction time-cost trade-off analysis
    Feng, CW
    Liu, L
    Burns, SA
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2000, 14 (02) : 117 - 126
  • [30] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637