A New Multiobjective Time-Cost Trade-Off for Scheduling Maintenance Problem in a Series-Parallel System

被引:4
|
作者
Tavassoli, Leyla Sadat [1 ]
Massah, Reza [2 ]
Montazeri, Arsalan [3 ]
Mirmozaffari, Mirpouya [1 ]
Jiang, Guang-Jun [4 ,5 ]
Chen, Hong-Xia [4 ,5 ]
机构
[1] Univ Texas Arlington, Dept Ind Mfg & Syst Engn, Arlington, TX 76019 USA
[2] Univ Texas Arlington, Dept Civil Engn, Arlington, TX 76019 USA
[3] Univ Isfahan, Dept Chem Engn, Esfahan, Iran
[4] Inner Mongolia Univ Technol, Sch Mech Engn, Hohhot 010051, Inner Mongolia, Peoples R China
[5] Inner Mongolia Key Lab Adv Mfg Technol, Hohhot 010051, Inner Mongolia, Peoples R China
基金
中国国家自然科学基金;
关键词
BI-OBJECTIVE OPTIMIZATION; EXTREME LEARNING-MACHINE; MODIFIED NSGA-II; DIAGNOSIS; STUDENTS; MODEL; ALGORITHM; SELECTION;
D O I
10.1155/2021/5583125
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, a modified model of Nondominated Sorting Genetic Algorithm 2 (NSGA-II), which is one of the Multiobjective Evolutionary Algorithms, is proposed. This algorithm is a new model designed to make a trade-off between minimizing the cost of preventive maintenance (PM) and minimizing the time taken to perform this maintenance for a series-parallel system. In this model, the limitations of labor and equipment of the maintenance team and the effects of maintenance issues on manufacturing problems are also considered. In the mathematical model, finding the appropriate objective functions for the maintenance scheduling problem requires all maintenance costs and failure rates to be integrated. Additionally, the effects of production interruption during preventive maintenance are added to objective functions. Furthermore, to make a better performance compared with a regular NSGA-II algorithm, we proposed a modified algorithm with a repository to keep more unacceptable solutions. These solutions can be modified and changed with the proposed mutation algorithm to acceptable solutions. In this algorithm, modified operators, such as simulated binary crossover and polynomial mutation, will improve the algorithm to generate convergence and uniformly distributed solutions with more diverse solutions. Finally, by comparing the experimental solutions with the solutions of two Strength Pareto Evolutionary Algorithm 2 (SPEA2) and regular NSGA-II, MNSGA-II generates more efficient and uniform solutions than the other two algorithms.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [42] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [43] A Dependent-Chance Programming Model for Fuzzy Time-Cost Trade-off Problem
    Ke, Hua
    Ma, Weimin
    2009 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 2009, : 2183 - 2186
  • [44] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [45] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty
    Ouyang Yong-liu
    Zhang Meng-xiang
    Han Lu
    Lu Yi
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292
  • [46] Evaluating time-cost trade-off in a resource constraint GERT-type project scheduling problem considering rework
    Sadri, Shadi
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2024, 11 (01)
  • [47] Closure to "Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search" by Zong Woo Geem
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (08): : 630 - 631
  • [48] Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
  • [49] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - CLOSURE
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 375 - 376
  • [50] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - DISCUSSION
    HANSCOM, GB
    WAUGH, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 374 - 375