A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project

被引:1
|
作者
Zheng, Huan [1 ,2 ]
机构
[1] Chongqing Technol & Business Univ, Sch Management, Chongqing 400067, Peoples R China
[2] Widener Univ, Sch Engn, Philadelphia, PA 19013 USA
关键词
Time-cost-environment; Trade-off; Multiple project; Fuzzyt; Hybrid genetic algorithm; CONSTRUCTION; OPTIMIZATION; UNCERTAINTY;
D O I
10.1007/978-3-319-59280-0_144
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Stronger environmental protection regulations and innovative contracting methods focused on reducing environmental impact through new incentives have placed increasing pressure on decision makers, especially those on large-scale construction projects. This increase has led to a need to identify optimal decision and select the most efficient construction modes for each activity to minimize not only the project's time and penalty costs but also its environmental impact. To address this need, this paper applies a mathematical model based on a hybrid genetic algorithm with fuzzy logic controller (flc-hGA) to the time-costenvironmental trade-off problem with multiple projects under a fuzzy environment. Applying the proposed method to the case study of the Jinping-I Hydropower Station, a large-scale project in Southwest China, clearly demonstrates its economic, technological, and social ecological effectiveness.
引用
收藏
页码:1709 / 1721
页数:13
相关论文
共 50 条
  • [11] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [12] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Vanhoucke, Mario
    Debels, Dieter
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 311 - 326
  • [13] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2022, 143
  • [14] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Mario Vanhoucke
    Dieter Debels
    Journal of Scheduling, 2007, 10 : 311 - 326
  • [15] Robust optimization models for the discrete time/cost trade-off problem
    Hazir, Oncu
    Erel, Erdal
    Gunalay, Yavuz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (01) : 87 - 95
  • [16] Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm
    Albayrak, Gulcag
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2023, 67 (03): : 806 - 818
  • [17] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [18] A hybrid genetic algorithm for the discrete time-cost trade-off problem
    Sonmez, Rifat
    Bettemir, Onder Halis
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (13) : 11428 - 11434
  • [19] Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    Hazir, Oencue
    Haouari, Mohamed
    Erel, Erdal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (02) : 633 - 643
  • [20] Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program
    Chen, Liangwei
    Zhang, Jingwen
    Peng, Wuliang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (07)