A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project
被引:1
|
作者:
Zheng, Huan
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Technol & Business Univ, Sch Management, Chongqing 400067, Peoples R China
Widener Univ, Sch Engn, Philadelphia, PA 19013 USAChongqing Technol & Business Univ, Sch Management, Chongqing 400067, Peoples R China
Zheng, Huan
[1
,2
]
机构:
[1] Chongqing Technol & Business Univ, Sch Management, Chongqing 400067, Peoples R China
[2] Widener Univ, Sch Engn, Philadelphia, PA 19013 USA
Stronger environmental protection regulations and innovative contracting methods focused on reducing environmental impact through new incentives have placed increasing pressure on decision makers, especially those on large-scale construction projects. This increase has led to a need to identify optimal decision and select the most efficient construction modes for each activity to minimize not only the project's time and penalty costs but also its environmental impact. To address this need, this paper applies a mathematical model based on a hybrid genetic algorithm with fuzzy logic controller (flc-hGA) to the time-costenvironmental trade-off problem with multiple projects under a fuzzy environment. Applying the proposed method to the case study of the Jinping-I Hydropower Station, a large-scale project in Southwest China, clearly demonstrates its economic, technological, and social ecological effectiveness.
机构:
Ferdowsi Univ Mashad, Fac Engn, Dept Ind Engn, Mashhad, IranFerdowsi Univ Mashad, Fac Engn, Dept Ind Engn, Mashhad, Iran
Ranjbar, Mohammad
De Reyck, Bert
论文数: 0引用数: 0
h-index: 0
机构:
UCL, Dept Management Sci & Innovat, London WC1E 6BT, England
London Business Sch, Dept Management Sci & Operat, London NW1 4SA, EnglandFerdowsi Univ Mashad, Fac Engn, Dept Ind Engn, Mashhad, Iran
De Reyck, Bert
Kianfar, Fereydoon
论文数: 0引用数: 0
h-index: 0
机构:
Sharif Univ Technol, Dept Ind Engn, Tehran, IranFerdowsi Univ Mashad, Fac Engn, Dept Ind Engn, Mashhad, Iran