A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency

被引:0
|
作者
Zhu, Chong [1 ]
Xue, Yuan [1 ]
He, Zhijie [1 ]
Bao, Zhenqiang [1 ]
Zhang, Zhaoyue [1 ]
Hu, Kaixuan [1 ]
机构
[1] Yangzhou Univ, Dept Informat Engn, Yangzhou, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019) | 2019年
关键词
Multi-skill Project Scheduling Problem; multi-objective model; human resource management; perform efficiency; improved NSGA-II algorithm; ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The growing need of responsiveness for enterprises facing market volatility raises a strong demand for flexibility in their human resource management. This paper presents a multi-objective model for Multi-skill Project Scheduling Problem. We propose a new wage distribution method in which different perform efficiencies of human resources are taken into account. The model aims at minimizing project duration and project costs concurrently. An improved NSGA-II algorithm is designed to solve the model. The algorithm introduces a multi-dimensional chromosome coding scheme to identify the priorities and staff allocation of each activity. Special chromosome crossover and mutation operation are employed to address resource conflicts and constraint violations. Eventually, A case study is presented to verify the efficiency of the proposed approach.
引用
收藏
页码:719 / 724
页数:6
相关论文
共 50 条
  • [31] A branch-and-bound method for solving multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    Neron, Emmanuel
    RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) : 155 - 170
  • [32] Heuristic and metaheuristic methods for the multi-skill project scheduling problem with partial preemption
    Polo-Mejia, Oliver
    Artigues, Christian
    Lopez, Pierre
    Monch, Lars
    Basini, Virginie
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2023, 30 (02) : 858 - 891
  • [33] GRASP Applied to Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Siemienski, Jedrzej J.
    COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2016, PT I, 2016, 9875 : 402 - 411
  • [34] Tabu Search approach for Multi-Skill Resource Constrained Project Scheduling Problem
    Skowronski, Marek E.
    Myszkowski, Pawel B.
    Adamski, Marcin
    Kwiatek, Pawel
    2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 153 - 158
  • [35] Lower bounds for the Multi-skill Project Scheduling Problem with hierarchical levels of skills
    Bellenguez, O
    Néron, E
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING V, 2005, 3616 : 229 - 243
  • [36] Satisfaction-driven bi-objective multi-skill workforce scheduling problem
    Liu, Ming
    Liu, Xin
    IFAC PAPERSONLINE, 2019, 52 (13): : 229 - 234
  • [37] Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 57 : 91 - 103
  • [38] Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem
    Yannibelli, Virginia
    Amandi, Analia
    EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (07) : 2421 - 2434
  • [39] The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 230 - 238
  • [40] Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Podlodowski, Lukasz
    2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 159 - 166