A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency

被引:0
|
作者
Zhu, Chong [1 ]
Xue, Yuan [1 ]
He, Zhijie [1 ]
Bao, Zhenqiang [1 ]
Zhang, Zhaoyue [1 ]
Hu, Kaixuan [1 ]
机构
[1] Yangzhou Univ, Dept Informat Engn, Yangzhou, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019) | 2019年
关键词
Multi-skill Project Scheduling Problem; multi-objective model; human resource management; perform efficiency; improved NSGA-II algorithm; ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The growing need of responsiveness for enterprises facing market volatility raises a strong demand for flexibility in their human resource management. This paper presents a multi-objective model for Multi-skill Project Scheduling Problem. We propose a new wage distribution method in which different perform efficiencies of human resources are taken into account. The model aims at minimizing project duration and project costs concurrently. An improved NSGA-II algorithm is designed to solve the model. The algorithm introduces a multi-dimensional chromosome coding scheme to identify the priorities and staff allocation of each activity. Special chromosome crossover and mutation operation are employed to address resource conflicts and constraint violations. Eventually, A case study is presented to verify the efficiency of the proposed approach.
引用
收藏
页码:719 / 724
页数:6
相关论文
共 50 条
  • [41] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Sikora, Krzysztof
    PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 : 129 - 138
  • [42] New algorithms for a partial multi-skill resource-constrained project scheduling problem
    Su Z.
    Gu H.
    Qi J.
    Wei H.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365
  • [43] Project Scheduling with Time Window Constraints on Multi-Skill Resources
    Liao Guang-Rui
    Liu Zhen-yuan
    Bi Yang
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4885 - 4891
  • [44] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem
    Zhou, Rong
    Ye, Chun-ming
    Ma, Hui-min
    19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
  • [45] Solving a real-life multi-skill resource-constrained multi-project scheduling problem
    Torba, Rahman
    Dauzere-Peres, Stephane
    Yugma, Claude
    Gallais, Cedric
    Pouzet, Juliette
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 69 - 114
  • [46] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    APPLIED SOFT COMPUTING, 2019, 85
  • [47] A Multi-Objective Dedicated Local Search for Project Scheduling Problem
    Nino, K.
    Mejia, G.
    Amodeo, L.
    IFAC PAPERSONLINE, 2016, 49 (12): : 875 - 880
  • [48] A Multi-objective Genetic Algorithm for the Software Project Scheduling Problem
    Garcia-Najera, Abel
    del Carmen Gomez-Fuentes, Maria
    NATURE-INSPIRED COMPUTATION AND MACHINE LEARNING, PT II, 2014, 8857 : 13 - 24
  • [49] A Novel Multi-Objective Project Portfolio Selection and Scheduling Problem
    Harrison, Kyle Robert
    Elsayed, Saber M.
    Weir, Terence
    Garanovich, Ivan L.
    Boswell, Sharon G.
    Sarker, Ruhul A.
    2022 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2022, : 480 - 487
  • [50] A Research on Shift Scheduling Problem in Multi-skill Call Center
    Dai, Tao
    Huo, Jiazhen
    IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 655 - 658