A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency

被引:0
|
作者
Zhu, Chong [1 ]
Xue, Yuan [1 ]
He, Zhijie [1 ]
Bao, Zhenqiang [1 ]
Zhang, Zhaoyue [1 ]
Hu, Kaixuan [1 ]
机构
[1] Yangzhou Univ, Dept Informat Engn, Yangzhou, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019) | 2019年
关键词
Multi-skill Project Scheduling Problem; multi-objective model; human resource management; perform efficiency; improved NSGA-II algorithm; ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The growing need of responsiveness for enterprises facing market volatility raises a strong demand for flexibility in their human resource management. This paper presents a multi-objective model for Multi-skill Project Scheduling Problem. We propose a new wage distribution method in which different perform efficiencies of human resources are taken into account. The model aims at minimizing project duration and project costs concurrently. An improved NSGA-II algorithm is designed to solve the model. The algorithm introduces a multi-dimensional chromosome coding scheme to identify the priorities and staff allocation of each activity. Special chromosome crossover and mutation operation are employed to address resource conflicts and constraint violations. Eventually, A case study is presented to verify the efficiency of the proposed approach.
引用
收藏
页码:719 / 724
页数:6
相关论文
共 50 条
  • [21] Multi-project scheduling problem under shared multi-skill resource constraints
    Meya Haroune
    Cheikh Dhib
    Emmanuel Neron
    Ameur Soukhal
    Hafed Mohamed Babou
    Mohamedade Farouk Nanne
    TOP, 2023, 31 : 194 - 235
  • [22] Multi-project scheduling problem under shared multi-skill resource constraints
    Haroune, Meya
    Dhib, Cheikh
    Neron, Emmanuel
    Soukhal, Ameur
    Babou, Hafed Mohamed
    Nanne, Mohamedade Farouk
    TOP, 2023, 31 (01) : 194 - 235
  • [23] Branch-and-price approach for the multi-skill project scheduling problem
    Montoya, Carlos
    Bellenguez-Morineau, Odile
    Pinson, Eric
    Rivreau, David
    OPTIMIZATION LETTERS, 2014, 8 (05) : 1721 - 1734
  • [24] Investigation of benchmark dataset for many-objective Multi-Skill Resource Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    APPLIED SOFT COMPUTING, 2022, 127
  • [25] Multi-skill project scheduling with skill evolution and cooperation effectiveness
    Li, Qian
    Sun, Qinshan
    Tao, Sha
    Gao, Xinglin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 2023 - 2045
  • [26] On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application
    Santos, Monica A.
    Tereso, Anabela P.
    SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2011, 96 : 239 - 248
  • [27] Efficiency of Specialized Genetic Operators in Non-dominated Tournament Genetic Algorithm (NTGA2) Applied to Multi-objective Multi-skill Resource Constrained Project Scheduling Problem
    Antkiewicz, Michal
    Myszkowski, Pawel Borys
    Gmyrek, Konrad
    Krzeminski, Adam
    Calvo-Rolle, Jose Luis
    ADVANCES IN COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2024, PT II, 2024, 2166 : 97 - 110
  • [28] A note on "branch-and-price approach for the multi-skill project scheduling problem"
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    OPTIMIZATION LETTERS, 2015, 9 (06) : 1255 - 1258
  • [29] Reinforcement learning-based algorithm for multi-skill project scheduling problem
    Hu Z.-T.
    Cui N.-F.
    Hu X.-J.
    Lei X.-Q.
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2024, 41 (03): : 502 - 511
  • [30] A note on “branch-and-price approach for the multi-skill project scheduling problem”
    Isabel Correia
    Francisco Saldanha-da-Gama
    Optimization Letters, 2015, 9 : 1255 - 1258