Multi-skill project scheduling with skill evolution and cooperation effectiveness

被引:6
|
作者
Li, Qian [1 ]
Sun, Qinshan [1 ]
Tao, Sha [1 ]
Gao, Xinglin [2 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing, Peoples R China
[2] Hong Kong Zhuhai Macao Bridge Author, Zhuhai, Peoples R China
基金
中国国家自然科学基金;
关键词
Organization; Optimization; Scheduling; Construction planning; WORKFORCE ALLOCATION; STAFF ASSIGNMENT; HUMAN-RESOURCES; MODEL; TEAM; ALGORITHM; PERFORMANCE;
D O I
10.1108/ECAM-06-2019-0294
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Recently, there has been increasing focus on the development of multi-skilled workforce in project management. The purpose of this paper is to investigate a multi-skill project scheduling problem (MSPSP), which combines project scheduling and multi-skill personnel assignment. The distinct features of skill evolution and cooperation effectiveness are considered in the problem to maximize the total project effectiveness and skill development simultaneously. Design/methodology/approach The Bi-objective non-linear integer programming (LIP) models are formulated for the problem using three types of skill development objective function: number of experts, total skill increment and "bottleneck" skill increment. Non-linear models are then linearized through several linearization techniques, and the epsilon-constraint method is used to convert the bi-objective models into single-objective models. Findings A construction project case is used to validate the proposed models. In comparison with models that do not consider skill evolution and cooperation effectiveness, the models proposed in this paper offer more realistic solutions and show better performance with regard to both project effectiveness and skill development. Originality/value This research extends the current MSPSP by considering skill evolution based on the "learning effect" as well as the influence of cooperation in an activity-based team, which are common phenomena in practice but seldom studied. LIP models formulated in this paper can be solved by any off-the-shelf optimization solver, such as CPLEX. Besides, the proposed LIP models can offer better project scheduling and personnel assignment plan, which would be of immense practical value in project management applications.
引用
收藏
页码:2023 / 2045
页数:23
相关论文
共 50 条
  • [1] Lower bounds for a multi-skill project scheduling problem
    Dhib, Cheikh
    Kooli, Anis
    Soukhal, Ameur
    Neron, Emmanuel
    OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 471 - 476
  • [2] Methods to solve multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01): : 85 - 88
  • [3] Methods to solve multi-skill project scheduling problem
    Odile Bellenguez-Morineau
    4OR, 2008, 6 : 85 - 88
  • [4] Constraint Programming Applied to the Multi-Skill Project Scheduling Problem
    Young, Kenneth D.
    Feydy, Thibaut
    Schutt, Andreas
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING (CP 2017), 2017, 10416 : 308 - 317
  • [5] Project Scheduling with Time Window Constraints on Multi-Skill Resources
    Liao Guang-Rui
    Liu Zhen-yuan
    Bi Yang
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4885 - 4891
  • [6] A Heuristic Method for the Multi-skill Project Scheduling Problem with Partial Preemption
    Polo-Mejia, Oliver
    Artigues, Christian
    Lopez, Pierre
    ICORES: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, 2019, : 111 - 120
  • [7] Branch-and-price approach for the multi-skill project scheduling problem
    Carlos Montoya
    Odile Bellenguez-Morineau
    Eric Pinson
    David Rivreau
    Optimization Letters, 2014, 8 : 1721 - 1734
  • [8] Branch-and-price approach for the multi-skill project scheduling problem
    Montoya, Carlos
    Bellenguez-Morineau, Odile
    Pinson, Eric
    Rivreau, David
    OPTIMIZATION LETTERS, 2014, 8 (05) : 1721 - 1734
  • [9] Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach
    Akbar, Saeed
    Zubair, Muhammad
    Khan, Rizwan
    Ul Akbar, Ubaid
    Ullah, Rahmat
    Zheng, Zhonglong
    IEEE ACCESS, 2024, 12 : 29824 - 29836
  • [10] A multi-mode multi-skill project scheduling reformulation for reconnaissance mission planning
    Junqi Cai
    Zhihong Peng
    Sijian Liao
    Shuxin Ding
    Science China Information Sciences, 2022, 65