共 50 条
- [1] Lower bounds for a multi-skill project scheduling problem OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 471 - 476
- [2] Methods to solve multi-skill project scheduling problem 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01): : 85 - 88
- [4] Constraint Programming Applied to the Multi-Skill Project Scheduling Problem PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING (CP 2017), 2017, 10416 : 308 - 317
- [5] Project Scheduling with Time Window Constraints on Multi-Skill Resources 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4885 - 4891
- [6] A Heuristic Method for the Multi-skill Project Scheduling Problem with Partial Preemption ICORES: PROCEEDINGS OF THE 8TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, 2019, : 111 - 120
- [7] Branch-and-price approach for the multi-skill project scheduling problem Optimization Letters, 2014, 8 : 1721 - 1734
- [10] A multi-mode multi-skill project scheduling reformulation for reconnaissance mission planning Science China Information Sciences, 2022, 65