Multi-skill project scheduling with skill evolution and cooperation effectiveness

被引:6
|
作者
Li, Qian [1 ]
Sun, Qinshan [1 ]
Tao, Sha [1 ]
Gao, Xinglin [2 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing, Peoples R China
[2] Hong Kong Zhuhai Macao Bridge Author, Zhuhai, Peoples R China
基金
中国国家自然科学基金;
关键词
Organization; Optimization; Scheduling; Construction planning; WORKFORCE ALLOCATION; STAFF ASSIGNMENT; HUMAN-RESOURCES; MODEL; TEAM; ALGORITHM; PERFORMANCE;
D O I
10.1108/ECAM-06-2019-0294
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Recently, there has been increasing focus on the development of multi-skilled workforce in project management. The purpose of this paper is to investigate a multi-skill project scheduling problem (MSPSP), which combines project scheduling and multi-skill personnel assignment. The distinct features of skill evolution and cooperation effectiveness are considered in the problem to maximize the total project effectiveness and skill development simultaneously. Design/methodology/approach The Bi-objective non-linear integer programming (LIP) models are formulated for the problem using three types of skill development objective function: number of experts, total skill increment and "bottleneck" skill increment. Non-linear models are then linearized through several linearization techniques, and the epsilon-constraint method is used to convert the bi-objective models into single-objective models. Findings A construction project case is used to validate the proposed models. In comparison with models that do not consider skill evolution and cooperation effectiveness, the models proposed in this paper offer more realistic solutions and show better performance with regard to both project effectiveness and skill development. Originality/value This research extends the current MSPSP by considering skill evolution based on the "learning effect" as well as the influence of cooperation in an activity-based team, which are common phenomena in practice but seldom studied. LIP models formulated in this paper can be solved by any off-the-shelf optimization solver, such as CPLEX. Besides, the proposed LIP models can offer better project scheduling and personnel assignment plan, which would be of immense practical value in project management applications.
引用
收藏
页码:2023 / 2045
页数:23
相关论文
共 50 条
  • [21] Lower bounds for the Multi-skill Project Scheduling Problem with hierarchical levels of skills
    Bellenguez, O
    Néron, E
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING V, 2005, 3616 : 229 - 243
  • [22] Tabu Search approach for Multi-Skill Resource Constrained Project Scheduling Problem
    Skowronski, Marek E.
    Myszkowski, Pawel B.
    Adamski, Marcin
    Kwiatek, Pawel
    2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 153 - 158
  • [23] Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
    Tian, Yuan
    Xiong, Tifan
    Liu, Zhenyuan
    Mei, Yi
    Wan, Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 167
  • [24] A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency
    Zhu, Chong
    Xue, Yuan
    He, Zhijie
    Bao, Zhenqiang
    Zhang, Zhaoyue
    Hu, Kaixuan
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 719 - 724
  • [25] On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application
    Santos, Monica A.
    Tereso, Anabela P.
    SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2011, 96 : 239 - 248
  • [26] Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 57 : 91 - 103
  • [27] The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 230 - 238
  • [28] A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Sikora, Krzysztof
    PROCEEDINGS OF THE 2015 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2015, 5 : 129 - 138
  • [29] New algorithms for a partial multi-skill resource-constrained project scheduling problem
    Su Z.
    Gu H.
    Qi J.
    Wei H.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2022, 42 (05): : 1345 - 1365
  • [30] Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Podlodowski, Lukasz
    2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2013, : 159 - 166