Time-cost relationships in Australian building construction projects

被引:68
|
作者
Love, PED [1 ]
Tse, RYC
Edwards, DJ
机构
[1] Edith Cowan Univ, Fac Business & Publ Management, Sch Management Informat Syst, We B Ctr, Perth, WA 6027, Australia
[2] Hong Kong Inst Real Estate, Hong Kong, Hong Kong, Peoples R China
[3] Loughborough Univ Technol, OPERC, Dep Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
Australia; Construction industry; Costs; Project management; Time factors: Least-squares method;
D O I
10.1061/(ASCE)0733-9364(2005)131:2(187)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project time-cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the Multiple regression technique of weighted least squares. The ana-lysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of Lime performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are, also presented.
引用
收藏
页码:187 / 194
页数:8
相关论文
共 50 条
  • [31] Time-Cost Tradeoffs Method for Hydropower Project Construction
    Lai Yifei
    Jia Junping
    Zhang Qianhua
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10548 - 10552
  • [32] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [33] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [34] Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects
    Eirgash, Mohammad Azim
    Togan, Vedat
    Dede, Tayfun
    Basaga, Hasan Basri
    STRUCTURES, 2023, 53 : 806 - 821
  • [35] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [36] A NOTE ON TIME-COST TRADEOFFS IN UNCERTAIN EMPIRICAL RESEARCH PROJECTS
    SCHERER, FM
    NAVAL RESEARCH LOGISTICS QUARTERLY, 1966, 13 (03): : 349 - &
  • [37] Cost structure of construction work on building projects
    Martinec, Neven
    Ajdukovic, Nevena Hrnjak
    Bezak, Stjepan
    GRADEVINAR, 2010, 62 (04): : 307 - 311
  • [38] Modified Streamlined Optimization Algorithm for Time-Cost Tradeoff Problems of Complex Large-Scale Construction Projects
    Wang, Jia
    Han, Congji
    Li, Xinghua
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)
  • [39] "The Fast and the Fantastic" Time-Cost Trade-Offs in New Product Development vs. Construction Projects
    Zidane, Youcef J-T.
    Rolstadas, Asbjorn
    Johansen, Agnar
    Ekambaram, Anandasivakumar
    Sriram, Pavan Kumar
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT I, 2015, 459 : 589 - 597
  • [40] Risk-Informed Time-Cost Relationship Models for Sanitation Projects
    Sousa, Vitor
    Almeida, Nuno Marques
    Dias, Luis Alves
    Branco, Fernando Antonio
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (05)