Time-cost relationships in Australian building construction projects

被引:68
|
作者
Love, PED [1 ]
Tse, RYC
Edwards, DJ
机构
[1] Edith Cowan Univ, Fac Business & Publ Management, Sch Management Informat Syst, We B Ctr, Perth, WA 6027, Australia
[2] Hong Kong Inst Real Estate, Hong Kong, Hong Kong, Peoples R China
[3] Loughborough Univ Technol, OPERC, Dep Civil & Bldg Engn, Loughborough LE11 3TU, Leics, England
关键词
Australia; Construction industry; Costs; Project management; Time factors: Least-squares method;
D O I
10.1061/(ASCE)0733-9364(2005)131:2(187)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project time-cost relationships were examined by using project scope factors as predictors for 161 construction projects that were completed in various Australian States using the Multiple regression technique of weighted least squares. The ana-lysis was performed between project duration (i.e., time), project type, procurement method, tender type, gross floor area (GFA), and number of stories. An alternative model to that proposed by Bromilow more than three decades ago for forecasting time and cost performance is proposed. It is shown that GFA and the number of stories in a building are key determinants of Lime performance in projects. Furthermore, the results indicate that cost is a poor predictor of time performance. Limitations and practical implications of the research are, also presented.
引用
收藏
页码:187 / 194
页数:8
相关论文
共 50 条
  • [21] Time-cost relationship of public sector projects in Malaysia
    Chan, Albert P.C.
    2001, Elsevier Ltd (19)
  • [22] Predicting Contract Duration for Building Construction: Is Bromilow's Time-Cost Model a Panacea?
    Jarkas, Abdulaziz M.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [23] Time-cost relationship for predicting construction duration
    Czarnigowska, A.
    Sobotka, A.
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2013, 13 (04) : 518 - 526
  • [24] Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach
    Yildirim, Hatice Acar
    Akcay, Cemil
    REVISTA DE LA CONSTRUCCION, 2019, 18 (03): : 554 - 567
  • [25] Mathematical modelling of embodied energy, greenhouse gases, waste, time-cost parameters of building projects: A review
    Abanda, F. H.
    Tah, J. H. M.
    Cheung, F. K. T.
    BUILDING AND ENVIRONMENT, 2013, 59 : 23 - 37
  • [26] Owner Time and Cost Contingency Estimation for Building Construction Projects in Egypt
    Nawar, Seif
    Hosny, Ossama
    Nassar, Khaled
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 367 - 377
  • [27] AEHO: Apriori-Based Optimized Model for Building Construction to Time-Cost Tradeoff Modeling
    Gupta, Rakesh
    Trivedi, Manoj Kumar
    IEEE ACCESS, 2022, 10 : 103852 - 103871
  • [28] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [29] Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria
    Eze, Emmanuel Chidiebere
    Idiake, John Ebhohimen
    INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2018, 5 (01): : 56 - 67
  • [30] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238