Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities

被引:1
|
作者
Zheng, Wei-bo [1 ,2 ]
He, Yu-kang [3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian, Shaanxi, Peoples R China
[2] Minist Educ Proc Control & Efficiency Engn, Key Lab, Xian, Shaanxi, Peoples R China
[3] Heilongjiang Univ, Sch Comp Sci & Technol, Harbin, Heilongjiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Optimization model; project scheduling; robustness; variable neighborhood search; TRADE-OFF; STABILITY; MODEL;
D O I
10.2991/978-94-6239-255-7_43
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper involves the resource constrained project robust scheduling problem where the objective is to maximize the robustness of the baseline schedule under the constraints of resources and project deadline. On the basis of the identification of the problem, the optimization model is constructed. Then, for the NP-hardness of the problem, the two versions of variable neighborhood search (VNS), i.e., the hybrid VNS and the parallel VNS, are developed to solve the problem. To evaluate the performance of the two VNS methods, a computational experiment is conducted based on a set of data consisting of 50 instances generated randomly. The results show that the developed algorithms can solve the problem with an acceptable computational time. With the increase of the problem scale, the hybrid VNS performs better while the parallel VNS becomes worse.
引用
收藏
页码:239 / 243
页数:5
相关论文
共 50 条
  • [1] Robust scheduling optimization for resource-constrained project based on random duration of activities
    He, Z.-W. (zhengwenhe@mail.xjtu.edu.cn), 2013, Systems Engineering Society of China (33):
  • [2] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28
  • [3] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Liu, Wanlin
    Ge, Li
    Qu, Chunli
    Yang, Shun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (01) : 15 - 28
  • [4] Robust resource-constrained max-NPV project scheduling with stochastic activity duration
    Yangyang Liang
    Nanfang Cui
    Tian Wang
    Erik Demeulemeester
    OR Spectrum, 2019, 41 : 219 - 254
  • [5] Robust resource-constrained max-NPV project scheduling with stochastic activity duration
    Liang, Yangyang
    Cui, Nanfang
    Wang, Tian
    Demeulemeester, Erik
    OR SPECTRUM, 2019, 41 (01) : 219 - 254
  • [6] A bi-objective optimization for finance-based and resource-constrained robust project scheduling
    Liu, Wanlin
    Zhang, Jingwen
    Liu, Cuifang
    Qu, Chunli
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 231
  • [7] Resource-constrained project scheduling under uncertain activity duration
    Willis, RJ
    Pan, HQ
    Yeh, CH
    COMPUTATIONAL INTELLIGENCE FOR MODELLING, CONTROL & AUTOMATION - EVOLUTIONARY COMPUTATION & FUZZY LOGIC FOR INTELLIGENT CONTROL, KNOWLEDGE ACQUISITION & INFORMATION RETRIEVAL, 1999, 55 : 429 - 434
  • [8] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [9] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu X.
    Liang S.
    Wang J.
    Cui N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [10] Resource-constrained project scheduling - Minimization of project duration
    不详
    PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174