Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities

被引:1
|
作者
Zheng, Wei-bo [1 ,2 ]
He, Yu-kang [3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian, Shaanxi, Peoples R China
[2] Minist Educ Proc Control & Efficiency Engn, Key Lab, Xian, Shaanxi, Peoples R China
[3] Heilongjiang Univ, Sch Comp Sci & Technol, Harbin, Heilongjiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Optimization model; project scheduling; robustness; variable neighborhood search; TRADE-OFF; STABILITY; MODEL;
D O I
10.2991/978-94-6239-255-7_43
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper involves the resource constrained project robust scheduling problem where the objective is to maximize the robustness of the baseline schedule under the constraints of resources and project deadline. On the basis of the identification of the problem, the optimization model is constructed. Then, for the NP-hardness of the problem, the two versions of variable neighborhood search (VNS), i.e., the hybrid VNS and the parallel VNS, are developed to solve the problem. To evaluate the performance of the two VNS methods, a computational experiment is conducted based on a set of data consisting of 50 instances generated randomly. The results show that the developed algorithms can solve the problem with an acceptable computational time. With the increase of the problem scale, the hybrid VNS performs better while the parallel VNS becomes worse.
引用
收藏
页码:239 / 243
页数:5
相关论文
共 50 条
  • [21] GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities' Cost
    Liu, ZY
    Wang, HW
    ADVANCES IN INTELLIGENT COMPUTING, PT 1, PROCEEDINGS, 2005, 3644 : 937 - 946
  • [22] A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
    Xiong, Jian
    Chen, Ying-wu
    Yang, Ke-wei
    Zhao, Qing-song
    Xing, Li-ning
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
  • [23] Resource Constrained Equipment Support Project Duration Optimization
    Wang Jiancheng
    Lu Yaping
    Wei Ming
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 894 - 898
  • [24] Research on the effectiveness of activities overlapping in reducing project duration under resource constrained condition
    Chu Z.
    Xu Z.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2019, 39 (09): : 2388 - 2397
  • [25] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247
  • [26] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    Journal of Scheduling, 2018, 21 : 349 - 365
  • [27] New strategies for stochastic resource-constrained project scheduling
    Rostami, Salim
    Creemers, Stefan
    Leus, Roel
    JOURNAL OF SCHEDULING, 2018, 21 (03) : 349 - 365
  • [28] Priority-rule-based resource-constrained project scheduling with the objective of minimizing activities' cost
    Liu, Zhen-Yuan
    Wang, Hong-Wei
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2006, 26 (09): : 99 - 106
  • [29] A ROBUST OPTIMIZATION MODEL FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
    Wang, Wei
    Shou, Yongyi
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2376 - 2381
  • [30] A robust optimization approach for the multi-mode resource-constrained project scheduling problem
    Balouka, Noemie
    Cohen, Izack
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) : 457 - 470