Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities

被引:1
|
作者
Zheng, Wei-bo [1 ,2 ]
He, Yu-kang [3 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian, Shaanxi, Peoples R China
[2] Minist Educ Proc Control & Efficiency Engn, Key Lab, Xian, Shaanxi, Peoples R China
[3] Heilongjiang Univ, Sch Comp Sci & Technol, Harbin, Heilongjiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Optimization model; project scheduling; robustness; variable neighborhood search; TRADE-OFF; STABILITY; MODEL;
D O I
10.2991/978-94-6239-255-7_43
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper involves the resource constrained project robust scheduling problem where the objective is to maximize the robustness of the baseline schedule under the constraints of resources and project deadline. On the basis of the identification of the problem, the optimization model is constructed. Then, for the NP-hardness of the problem, the two versions of variable neighborhood search (VNS), i.e., the hybrid VNS and the parallel VNS, are developed to solve the problem. To evaluate the performance of the two VNS methods, a computational experiment is conducted based on a set of data consisting of 50 instances generated randomly. The results show that the developed algorithms can solve the problem with an acceptable computational time. With the increase of the problem scale, the hybrid VNS performs better while the parallel VNS becomes worse.
引用
收藏
页码:239 / 243
页数:5
相关论文
共 50 条
  • [41] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [42] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
    Guo, Fang Ming
    Ma, Li
    He, Min
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
  • [43] An order-based fruit fly optimization algorithm for stochastic resource-constrained project scheduling
    Zheng, Xiao-Long
    Wang, Ling
    Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2015, 32 (04): : 540 - 545
  • [44] Project scheduling problem with stochastic resource-dependent activity duration
    Zhong, Chunjie
    Yu, Ying
    Jia, YunLang
    MECHANICAL ENGINEERING, MATERIALS AND ENERGY III, 2014, 483 : 607 - +
  • [45] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations
    Csebfalvi, G.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [46] Critical Sequences and Resource Links Optimization in Resource-Constrained Project Scheduling
    Cui, Wan-An
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2018, 35 (05)
  • [47] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Nabipoor Afruzi E.
    Aghaie A.
    Najafi A.A.
    Scientia Iranica, 2020, 27 (1 E) : 361 - 376
  • [48] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [49] A lexicographic approach to the robust resource-constrained project scheduling problem
    Palacio, Juan D.
    Larrea, Olga L.
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2017, 24 (1-2) : 143 - 157
  • [50] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Afruzi, E. Nabipoor
    Aghaie, A.
    Najafi, A. A.
    SCIENTIA IRANICA, 2020, 27 (01) : 361 - 376