Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach

被引:0
|
作者
Yildirim, Hatice Acar [1 ]
Akcay, Cemil [2 ]
机构
[1] Istanbul Univ, Inst Grad Studies Sci & Engn, TR-34320 Istanbul, Turkey
[2] Istanbul Univ, Fac Architecture, TR-34116 Istanbul, Turkey
来源
REVISTA DE LA CONSTRUCCION | 2019年 / 18卷 / 03期
关键词
Construction project; time-cost optimization; genetic algorithm; fuzzy logic; TRADE-OFF;
D O I
10.7764/RDLC.18.3.554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
引用
收藏
页码:554 / 567
页数:14
相关论文
共 50 条
  • [31] Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects
    Eirgash, Mohammad Azim
    Togan, Vedat
    Dede, Tayfun
    Basaga, Hasan Basri
    STRUCTURES, 2023, 53 : 806 - 821
  • [32] Time-cost-quality-risk Trade-off Project Scheduling Problem in Oil and Gas Construction Projects: Fuzzy Logic and Genetic Algorithm
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (02) : 355 - 364
  • [33] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [34] Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
    Zheng, DXM
    Ng, ST
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (02) : 176 - 186
  • [35] Systematic Review of the Time-Cost Optimization Models in Construction Management
    ElSahly, Osama Mohamed
    Ahmed, Salma
    Abdelfatah, Akmal
    SUSTAINABILITY, 2023, 15 (06)
  • [36] A fuzzy logic approach to model delays in construction projects using translational models
    Al-Humaidi, H. M.
    Tan, F. Hadipriono
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2010, 27 (04) : 353 - 364
  • [37] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [38] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [39] Time-cost optimization: using GA and fuzzy sets theory for uncertainties in cost
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (07) : 679 - 691
  • [40] A time-cost trade-off model with resource consideration using genetic algorithm
    Chua, DKH
    Chan, WT
    Govindan, K
    CIVIL ENGINEERING SYSTEMS, 1997, 14 (04): : 291 - 311