Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach

被引:0
|
作者
Yildirim, Hatice Acar [1 ]
Akcay, Cemil [2 ]
机构
[1] Istanbul Univ, Inst Grad Studies Sci & Engn, TR-34320 Istanbul, Turkey
[2] Istanbul Univ, Fac Architecture, TR-34116 Istanbul, Turkey
来源
REVISTA DE LA CONSTRUCCION | 2019年 / 18卷 / 03期
关键词
Construction project; time-cost optimization; genetic algorithm; fuzzy logic; TRADE-OFF;
D O I
10.7764/RDLC.18.3.554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
引用
收藏
页码:554 / 567
页数:14
相关论文
共 50 条
  • [41] Self-adaptive ant colony optimization for construction time-cost optimization
    Li, Huimin
    Li, Peng
    KYBERNETES, 2013, 42 (08) : 1181 - 1194
  • [42] A Multi-objective Genetic Algorithm for Optimization Time-Cost Trade-off Scheduling
    Aghassi, Hadi
    Abadi, Sedigheh Nader
    Roghanian, Emad
    KNOWLEDGE TECHNOLOGY, 2012, 295 : 356 - +
  • [43] The Mechanism of Design Activity Overlapping in Construction Projects and the Time-Cost Tradeoff Function
    Dehghan, R.
    Ruwanpura, J. Y.
    PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [44] Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach
    Glisovic, Natasa
    ECONOMICS AND SOCIAL SCIENCE, 2013, 13 : 121 - 126
  • [45] Longest path time-cost analysis of construction projects with generalised activity constraints
    Athanasios P. Chassiakos
    Operational Research, 2006, 6 (3)
  • [46] The application of linear programming model in time-cost optimization
    Wang, Zhaohong
    Zhan, Wei
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, 2008, : 210 - 213
  • [47] A Fuzzy Simulated Annealing approach for project time-cost tradeoff
    Milenkovic, Milos
    Bojovic, Nebojsa
    Ribeiro, Rita Almeida
    Glisovic, Natasa
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2012, 23 (05) : 203 - 215
  • [48] Using improved genetic algorithms to facilitate time-cost optimization
    Li, H
    Love, P
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1997, 123 (03) : 233 - 237
  • [49] A Fuzzy Random Time-Cost Trade-off Model
    Ke, Hua
    Ma, Weimin
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
  • [50] Solution for Time-cost Optimization Problems Based on Particle Swarm Optimization Algorithm
    Zhao Lihong
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2008, : 1321 - 1325