Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach

被引:0
|
作者
Yildirim, Hatice Acar [1 ]
Akcay, Cemil [2 ]
机构
[1] Istanbul Univ, Inst Grad Studies Sci & Engn, TR-34320 Istanbul, Turkey
[2] Istanbul Univ, Fac Architecture, TR-34116 Istanbul, Turkey
来源
REVISTA DE LA CONSTRUCCION | 2019年 / 18卷 / 03期
关键词
Construction project; time-cost optimization; genetic algorithm; fuzzy logic; TRADE-OFF;
D O I
10.7764/RDLC.18.3.554
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering the construction industry holds ten percent on average in the gross national product over the world, the importance of efficient use of resources emerges. To alleviate the possibility of the risk factors and various uncertainties' negative impact on the project, the usage of the scheduling tools should be supported for planning as well as risk management. In today's construction perspective, the quality is not a primary objective; construction projects have to be completed within the cost and duration limits. During the construction progress, the inserting of extra activities affects to construction delays. Project success; from the planning stage to the completion of the building, it is possible to plan the resources, use them efficiently, and realize the determined time and cost objectives. In this study, a model is developed by using a fuzzy logic approach and genetic algorithm in order to provide time-cost optimization in construction projects under uncertainties. Firstly, fuzzy sets are used to take into account the effects of time and cost uncertainties on construction works. Fuzzy sets are used to model uncertainties, and the genetic algorithm is used to acquire minimum Project cost and duration. Thus, by establishing a fuzzy time-cost optimization model, optimum time-cost results are obtained according to different risk levels determined by the decision-makers. At the final stage, Pareto fronts from different risk levels that contain both minimum costs and durations are obtained and plotted.
引用
收藏
页码:554 / 567
页数:14
相关论文
共 50 条
  • [21] Using the MD CAD model to develop the time-cost integrated schedule for construction projects
    Feng, Chung-Wei
    Chen, Yi-Jao
    Huang, Jiun-Ru
    AUTOMATION IN CONSTRUCTION, 2010, 19 (03) : 347 - 356
  • [22] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [23] The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects
    Sousa, Vitor
    Meireles, Ines
    WATER RESOURCES MANAGEMENT, 2018, 32 (08) : 2753 - 2766
  • [24] Development of time-cost trade-off optimization model for Indian highway construction projects using non-dominated sorting genetic algorithm-II methodology
    Kandipilli Mehar Kumar
    Deepanshu Agrawal
    Vinod Kumar Vishwakarma
    Mohammad Azim Eirgash
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5975 - 5988
  • [25] Using the MD CAD model to develop the time-cost integrated schedule for construction projects
    Feng, Chung-Wei
    Chen, Yi-Jao
    25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 573 - +
  • [26] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [27] A genetic algorithm approach for the time-cost trade-off in PERT networks
    Azaron, A
    Perkgoz, C
    Sakawa, M
    APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (02) : 1317 - 1339
  • [28] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Heravi, Gholamreza
    Moridi, Saeed
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (08) : 3265 - 3274
  • [29] Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects
    Gholamreza Heravi
    Saeed Moridi
    KSCE Journal of Civil Engineering, 2019, 23 : 3265 - 3274
  • [30] Multi-objective optimization of time-cost-quality in construction projects using genetic algorithm
    Isikyildiz, Setenay
    Akcay, Cemil
    REVISTA DE LA CONSTRUCCION, 2020, 19 (03): : 335 - 346