A multi-parameter optimization technique for prestressed concrete cable-stayed bridges considering prestress in girder

被引:12
|
作者
Gao, Qiong [1 ]
Yang, Meng-Gang [1 ]
Qiao, Jian-Dong [1 ]
机构
[1] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
cable-stayed bridge; prestressed concrete; multi-parameter; optimization technique; prestressing tension; OPTIMUM DESIGN; FORCES; ALGORITHM; ELEMENT; DECKS;
D O I
10.12989/sem.2017.64.5.567
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional design procedure of a prestressed concrete (PC) cable-stayed bridge is complex and time-consuming. The designers have to repeatedly modify the configuration of the large number of design parameters to obtain a feasible design scheme which maybe not an economical design. In order to efficiently achieve an optimum design for PC cable-stayed bridges, a multi-parameter optimization technique is proposed. In this optimization technique, the number of prestressing tendons in girder is firstly set as one of design variables, as well as cable forces, cable areas and cross-section sizes of the girders and the towers. The stress and displacement constraints are simultaneously utilized to ensure the safety and serviceability of the structure. The target is to obtain the minimum cost design for a PC cable-stayed bridge. Finally, this optimization technique is carried out by a developed PC cable-stayed bridge optimization program involving the interaction of the parameterized automatically modeling program, the finite element structural analysis program and the optimization algorithm. A low-pylon PC cable-stayed bridge is selected as the example to test the proposed optimization technique. The optimum result verifies the capability and efficiency of the optimization technique, and the significance to optimize the number of prestressing tendons in the girder. The optimum design scheme obtained by the application can achieve a 24.03% reduction in cost, compared with the initial design.
引用
收藏
页码:567 / 577
页数:11
相关论文
共 50 条
  • [21] Optimization of cable preloading on cable-stayed bridges
    Wang, YC
    Vlahinos, AS
    Shu, HS
    SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS - SMART STRUCTURES AND MATERIALS 1997, 1997, 3043 : 248 - 259
  • [22] Shape and sizing optimization of box-girder decks of cable-stayed bridges
    Negrao, JH
    Simoes, LMC
    COMPUTER AIDED OPTIMUM DESIGN OF STRUCTURES VI, 1999, 5 : 323 - 332
  • [23] Shape and sizing optimization of box-girder decks of cable-stayed bridges
    Negrao, J.H.
    Simoes, L.M.C.
    International Conference on Computer Aided Optimum Design of Structures, OPTI, Proceedings, 1999, 5 : 323 - 332
  • [24] Optimization of cable forces on concrete cable-stayed bridges including geometrical nonlinearities
    Martins, A. M. B.
    Simoes, L. M. C.
    Negrao, J. H. J. O.
    COMPUTERS & STRUCTURES, 2015, 155 : 18 - 27
  • [25] Biobjective Optimization of Cable Force for Concrete Cable-Stayed Bridges Considering the Requirements of the Serviceability and Ultimate Limit State
    Cao, Hongyou
    Li, Huiyang
    Zhou, Yunhua
    Li, Zhi
    Feng, Liuyang
    JOURNAL OF BRIDGE ENGINEERING, 2024, 29 (06)
  • [26] Practical algorithm for optimization of cable forces in completion of steel truss girder cable-stayed bridges
    He, Xu-Hui
    Yang, Xian-Kang
    Zhu, Wei
    Tiedao Xuebao/Journal of the China Railway Society, 2014, 36 (06): : 99 - 106
  • [27] Damping Effects of Cable Dampers on Girder Vibrations of Cable-Stayed Bridges
    Sae-Ma, P.
    Sun, L.
    Chen, L.
    Liu, Z.
    PROCEEDINGS OF THE 17TH EAST ASIAN-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION, EASEC-17 2022, 2023, 302 : 1135 - 1145
  • [28] Optimum design of concrete cable-stayed bridges
    Martins, Alberto M. B.
    Simoes, Luis M. C.
    Negrao, Joao H. J. O.
    ENGINEERING OPTIMIZATION, 2016, 48 (05) : 772 - 791
  • [29] EVOLUTION OF CONCRETE CABLE-STAYED BRIDGES.
    Podolny Jr., Walter
    Concrete International, 1981, 3 (08) : 34 - 42
  • [30] Construction stage analysis on replacement of closure segment in prestressed concrete cable-stayed bridges
    Li, H.-J. (hj.li@rioh.cn), 2012, China National Publications Import and Export (Group) Corporation (34):