共 50 条
- [31] Research on optimization method of concrete cable-stayed bridges in construction control Jianzhu Jiegou Xuebao, 2008, SUPPL. (111-114):
- [32] Dynamic response of concrete cable-stayed bridges STRUCTURAL DYNAMICS, VOLS 1 AND 2, 1999, : 741 - 746
- [33] Analysis on Stiff Frame in Replacement of Closure Segment for Prestressed Concrete Cable-stayed Bridges ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 1423 - 1431
- [34] RECONSTRUCTION OF THE CLOSURE SEGMENT OF MAIN SPAN IN EXISTING PRESTRESSED CONCRETE CABLE-STAYED BRIDGES PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 539 - 545
- [36] Study on Box Girder Damage Identification of Cable-Stayed Bridges ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION II, PTS 1 AND 2, 2012, 102-102 : 1156 - +
- [37] The cable force determination and optimization of the long-span concrete cable-stayed bridges STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 690 - 695
- [39] Effect of girder's vibration on performance of cable dampers for cable-stayed bridges Lixue Xuebao/Chinese Journal of Theoretical and Applied Mechanics, 2009, 41 (04): : 563 - 574
- [40] Research on Simplified Model for Cable-girder Vibration of Cable-stayed Bridges 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 784 - 792