A multi-parameter optimization technique for prestressed concrete cable-stayed bridges considering prestress in girder

被引:12
|
作者
Gao, Qiong [1 ]
Yang, Meng-Gang [1 ]
Qiao, Jian-Dong [1 ]
机构
[1] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
cable-stayed bridge; prestressed concrete; multi-parameter; optimization technique; prestressing tension; OPTIMUM DESIGN; FORCES; ALGORITHM; ELEMENT; DECKS;
D O I
10.12989/sem.2017.64.5.567
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional design procedure of a prestressed concrete (PC) cable-stayed bridge is complex and time-consuming. The designers have to repeatedly modify the configuration of the large number of design parameters to obtain a feasible design scheme which maybe not an economical design. In order to efficiently achieve an optimum design for PC cable-stayed bridges, a multi-parameter optimization technique is proposed. In this optimization technique, the number of prestressing tendons in girder is firstly set as one of design variables, as well as cable forces, cable areas and cross-section sizes of the girders and the towers. The stress and displacement constraints are simultaneously utilized to ensure the safety and serviceability of the structure. The target is to obtain the minimum cost design for a PC cable-stayed bridge. Finally, this optimization technique is carried out by a developed PC cable-stayed bridge optimization program involving the interaction of the parameterized automatically modeling program, the finite element structural analysis program and the optimization algorithm. A low-pylon PC cable-stayed bridge is selected as the example to test the proposed optimization technique. The optimum result verifies the capability and efficiency of the optimization technique, and the significance to optimize the number of prestressing tendons in the girder. The optimum design scheme obtained by the application can achieve a 24.03% reduction in cost, compared with the initial design.
引用
收藏
页码:567 / 577
页数:11
相关论文
共 50 条
  • [41] SIZING AND GEOMETRY OPTIMIZATION OF CABLE-STAYED BRIDGES
    SIMOES, LMC
    NEGRAO, JHO
    COMPUTERS & STRUCTURES, 1994, 52 (02) : 309 - 321
  • [42] Experiment on performance of cable dampers influened by girder vibration for cable-stayed bridges
    College of Civil Engineering, Hebei University of Technology, Tianjin 300130, China
    不详
    Zhendong Gongcheng Xuebao, 2009, 1 (13-18):
  • [43] Frequency Veering Analysis of Cable-girder system for Cable-Stayed Bridges
    Chen Weizhen
    Yang, Zhao
    Xue, Liu
    2014 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA), 2014, : 951 - 956
  • [44] Load transfer mechanism of steel-concrete joint in hybrid girder cable-stayed bridges
    Wang, Taiqi
    Liu, Yuqing
    Wang, Shumin
    Ma, Guang
    Yang, Xinran
    Wang, Sihao
    Journal of Constructional Steel Research, 2025, 230
  • [45] Nonlinear analysis of prestressed concrete cable-stayed bridges with long span under construction state
    Liu, Yun
    Wei, Chenglong
    Yan, Donghuang
    Liu, Xiaoyan
    EVALUATION, INSPECTION AND MONITORING OF STRUCTURAL INTEGRITY, 2008, : 95 - 98
  • [46] Optimum design of cable-stayed bridges considering cable loss scenarios
    Ahmed A.R.
    Yermoshin N.A.
    Asian Journal of Civil Engineering, 2024, 25 (3) : 2801 - 2809
  • [47] TIME-DEPENDENT ANALYSIS AND CABLE STRETCHING FORCE OPTIMIZATION OF CONCRETE CABLE-STAYED BRIDGES
    Martins, Alberto M. B.
    Simoes, Luis M. C.
    Negrao, Joao H. J. O.
    CORAN 2011: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN NONLINEAR MODELS - STRUCTURAL CONCRETE APPLICATIONS, 2011, : 355 - 368
  • [48] Design optimization of fatigue test model for the cable-girder anchorage zone of steel cable-stayed bridges
    Man, Honggao
    Li, Qiao
    Zhang, Yuzhi
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2007, 37 (02): : 301 - 305
  • [49] FULLY NONLINEAR-ANALYSIS OF COMPOSITE GIRDER CABLE-STAYED BRIDGES
    ADELI, H
    ZHANG, J
    COMPUTERS & STRUCTURES, 1995, 54 (02) : 267 - 277
  • [50] OPTIMUM CABLE-FORCE ADJUSTMENTS IN CONCRETE CABLE-STAYED BRIDGES
    KASUGA, A
    ARAI, H
    BREEN, JE
    FURUKAWA, K
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1995, 121 (04): : 685 - 694