共 50 条
- [1] Analysis on Stiff Frame in Replacement of Closure Segment for Prestressed Concrete Cable-stayed Bridges ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 1423 - 1431
- [2] RECONSTRUCTION OF THE CLOSURE SEGMENT OF MAIN SPAN IN EXISTING PRESTRESSED CONCRETE CABLE-STAYED BRIDGES PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 539 - 545
- [3] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (01): : 68 - 79
- [4] Thermal Effects in Prestressed Concrete Cable-Stayed Bridge during Replacement of Closure Segment CICTP 2019: TRANSPORTATION IN CHINA-CONNECTING THE WORLD, 2019, : 171 - 180
- [5] Analysis on Safety of Removing the Closure Segment in a Prestressed Concrete Cable-stayed Bridge INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 464 - 473
- [6] Stochastic Analysis of Prestressed Concrete Cable-stayed Bridges considering Construction Errors ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1023 - 1028
- [7] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE - COMMENT JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (05): : 115 - 116
- [8] Technologies on Replacement of Structural Members in Prestressed Concrete Cable-stayed Bridges TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1158 - 1166