Construction stage analysis on replacement of closure segment in prestressed concrete cable-stayed bridges

被引:0
|
作者
机构
[1] Li, Hong-Jiang
来源
Li, H.-J. (hj.li@rioh.cn) | 2012年 / China National Publications Import and Export (Group) Corporation卷 / 34期
关键词
15;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Cable Replacement Method for Cable-Stayed Bridges Based on Sensitivity Analysis
    Fu, Zhongqiu
    Ji, Bohai
    Yang, Muye
    Sun, Hongbin
    Maeno, Hirofumi
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2015, 29 (03)
  • [22] CABLE-STAYED BRIDGES - DEGREES OF ANCHORING - CLOSURE
    GILSANZ, RE
    BIGGS, JM
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1984, 110 (04): : 913 - 914
  • [24] Research on optimization method of concrete cable-stayed bridges in construction control
    Institute of Bridge Engineering, Dalian University of Technology, Dalian 116024, China
    不详
    Jianzhu Jiegou Xuebao, 2008, SUPPL. (111-114):
  • [25] Optimum design of concrete cable-stayed bridges
    Martins, Alberto M. B.
    Simoes, Luis M. C.
    Negrao, Joao H. J. O.
    ENGINEERING OPTIMIZATION, 2016, 48 (05) : 772 - 791
  • [26] EVOLUTION OF CONCRETE CABLE-STAYED BRIDGES.
    Podolny Jr., Walter
    Concrete International, 1981, 3 (08) : 34 - 42
  • [27] Dynamic response of concrete cable-stayed bridges
    Máca, J
    Studnicková, M
    STRUCTURAL DYNAMICS, VOLS 1 AND 2, 1999, : 741 - 746
  • [28] Simulation of cantilever-casting construction of prestressed concrete cable-stayed bridge
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    Huazhong Ligong Daxue Xuebao, 2008, 4 (115-118):
  • [29] Gust response of a prestressed concrete cable-stayed bridge under cantilever construction
    Niihara, Y
    Nakano, R
    Hayashida, K
    STRUCTURAL SAFETY AND RELIABILITY, VOLS. 1-3, 1998, : 1461 - 1464
  • [30] Reliability of construction control of cable-stayed bridges
    Su, Cheng
    Chen, Zhaoshuan
    Chen, Zhihui
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2011, 164 (01) : 15 - 22