Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems

被引:155
|
作者
El Asmar, Mounir [1 ]
Hanna, Awad S. [2 ]
Loh, Wei-Yin [3 ]
机构
[1] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ 85287 USA
[2] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
[3] Univ Wisconsin, Dept Stat, Madison, WI 53706 USA
关键词
Project delivery; Innovation; Construction management; Integrated project delivery; Innovative delivery methods; Performance metrics; Contracting;
D O I
10.1061/(ASCE)CO.1943-7862.0000744
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather quantitative performance data from 35 recently completed projects. Univariate data analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate IPD performance. The results indicate that IPD achieves statistically significant improvements in 14 metrics across six performance areas: quality, schedule, project changes, communication among stakeholders, environmental, and financial performance. The major contribution of this paper is demonstrating that IPD provides higher quality facilities faster and at no significant cost premium. These results would be extremely valuable in the hands of decision makers to enable them to choose the appropriate delivery system for their projects.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Winter chiller alternative project using integrated project delivery
    Parolise, Amanda
    Engineered Systems, 2019, 36 (10): : 10 - 12
  • [42] Evaluating Integrated Project Delivery Using the Project Quarterback Rating
    El Asmar, Mounir
    Hanna, Awad S.
    Loh, Wei-Yin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
  • [43] Comparison of US project delivery systems
    Konchar, M
    Sanvido, V
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (06): : 435 - 444
  • [44] Project delivery systems for nZEB projects
    Kantola, Mikko
    Saari, Arto
    FACILITIES, 2016, 34 (1-2) : 85 - 100
  • [45] PROJECT DELIVERY SYSTEMS FOR CONSTRUCTION PROJECTS
    KETTLE, KA
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1976, 102 (04): : 575 - 585
  • [46] PROJECT DELIVERY SYSTEMS FOR CONSTRUCTION PROJECTS
    HOHNS, HM
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1977, 103 (02): : 307 - 307
  • [47] Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality
    Agbaxode, Peter Dodzi Kwasi
    Saghatforoush, Ehsan
    Dlamini, Sitsabo
    Korsah, John Kwesi
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (06) : 817 - 834
  • [48] Party Selection for Integrated Project Delivery Based on Interorganizational Transactive Memory System
    Zhang, Lianying
    Cheng, Jiajia
    Fan, Weijie
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [49] Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course
    Al Junid, Syed Abdul Mutalib
    Hussaini, Yusnira
    Osman, Fairul Nazmie
    Razak, Abdul Hadi Abdul
    Idros, Mohd Faizul Md
    Halim, Abdul Karimi
    INTERNATIONAL CONFERENCE ON APPLIED ELECTRONIC AND ENGINEERING 2017 (ICAEE2017), 2018, 341
  • [50] Integrated Project Controlling Management under Design-Build Delivery System
    Xiu, Xiao-bei
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 194 - 198