Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems

被引:155
|
作者
El Asmar, Mounir [1 ]
Hanna, Awad S. [2 ]
Loh, Wei-Yin [3 ]
机构
[1] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ 85287 USA
[2] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
[3] Univ Wisconsin, Dept Stat, Madison, WI 53706 USA
关键词
Project delivery; Innovation; Construction management; Integrated project delivery; Innovative delivery methods; Performance metrics; Contracting;
D O I
10.1061/(ASCE)CO.1943-7862.0000744
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather quantitative performance data from 35 recently completed projects. Univariate data analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate IPD performance. The results indicate that IPD achieves statistically significant improvements in 14 metrics across six performance areas: quality, schedule, project changes, communication among stakeholders, environmental, and financial performance. The major contribution of this paper is demonstrating that IPD provides higher quality facilities faster and at no significant cost premium. These results would be extremely valuable in the hands of decision makers to enable them to choose the appropriate delivery system for their projects.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Performance of integrated delivery systems: quality, service and cost implications
    Leibert, Michael
    LEADERSHIP IN HEALTH SERVICES, 2011, 24 (03) : 196 - 206
  • [22] Svelte Integrated Delivery System Performance Examined Through Diagnostic Catheter Delivery: The SPEED Registry
    Khattab, Ahmed A.
    Nijhoff, Freek
    Schofer, Joachim
    Berland, Jacques
    Meier, Bernhard
    Nietlispach, Fabian
    Agostoni, Pierfrancesco
    Brucks, Steffen
    Stella, Pieter
    CATHETERIZATION AND CARDIOVASCULAR INTERVENTIONS, 2015, 85 (01) : E23 - E31
  • [23] Influence of Integrated Project Delivery Principles on Project Performance in China: An SEM-Based Approach
    Mei, Tingting
    Guo, Zeng
    Li, Peng
    Fang, Kaixian
    Zhong, Shuda
    SUSTAINABILITY, 2022, 14 (08)
  • [24] Integrated Digital Delivery: Implementation status and project performance in the Singapore construction industry
    Hwang, Bon-Gang
    Ngo, Jasmine
    Her, Priscilla Wan Yi
    JOURNAL OF CLEANER PRODUCTION, 2020, 262 (262)
  • [25] Trust and Control in the context of Integrated Project Delivery
    Haghsheno, S.
    Vaeth, C.
    Schmidt, J-S.
    Hanau, A.
    Budau, M. R. -D.
    Frantz, L.
    BAUINGENIEUR, 2023, 98 (06): : 197 - 206
  • [26] Unveiling Embedded Risks in Integrated Project Delivery
    Ma, Qiuwen
    Li, Shan
    Cheung, Sai On
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (01)
  • [27] Contractual Guidelines for Promoting Integrated Project Delivery
    Ahmed, Muaz O.
    Nabi, Mohamad Abdul
    El-adaway, Islam H.
    Caranci, Dustin
    Eberle, Jackson
    Hawkins, Zachary
    Sparrow, Ross
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)
  • [28] Comparative Analysis between Project Delivery Systems through Quantitative Assessment of Project Performance
    Ibrahim, Michael
    Hanna, Awad
    Kievet, Dave
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 670 - 680
  • [29] Facing the challenges of integrated design and project delivery
    Hellmund, Amy J.
    Van Den Wymelenberg, Kevin G.
    Baker, Kenneth
    Energy Engineering: Journal of the Association of Energy Engineering, 2008, 105 (06): : 36 - 47
  • [30] Early Stages in the Institutionalization of Integrated Project Delivery
    Hall, Daniel M.
    Scott, W. Richard
    PROJECT MANAGEMENT JOURNAL, 2019, 50 (02) : 128 - 143