Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems

被引:155
|
作者
El Asmar, Mounir [1 ]
Hanna, Awad S. [2 ]
Loh, Wei-Yin [3 ]
机构
[1] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ 85287 USA
[2] Univ Wisconsin, Dept Civil & Environm Engn, Madison, WI 53706 USA
[3] Univ Wisconsin, Dept Stat, Madison, WI 53706 USA
关键词
Project delivery; Innovation; Construction management; Integrated project delivery; Innovative delivery methods; Performance metrics; Contracting;
D O I
10.1061/(ASCE)CO.1943-7862.0000744
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed and utilized in detailed interviews to gather quantitative performance data from 35 recently completed projects. Univariate data analyses, such as t-tests and Mann-Whitney-Wilcoxon tests, were performed to evaluate IPD performance. The results indicate that IPD achieves statistically significant improvements in 14 metrics across six performance areas: quality, schedule, project changes, communication among stakeholders, environmental, and financial performance. The major contribution of this paper is demonstrating that IPD provides higher quality facilities faster and at no significant cost premium. These results would be extremely valuable in the hands of decision makers to enable them to choose the appropriate delivery system for their projects.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Implications of the Integrated Project Delivery Research in Practice
    Gomez, Sulyn
    Naderpajouh, Nader
    Ballard, Glenn
    Hastak, Makarand
    Weidner, Theodore J.
    Barriga, Paulo
    CONSTRUCTION RESEARCH CONGRESS 2018: SUSTAINABLE DESIGN AND CONSTRUCTION AND EDUCATION, 2018, : 86 - 96
  • [32] An Integration of BIM and GIS for Integrated Project Delivery
    Gao, Zhili
    Ezekwem, Kenechukwu
    Aslam, Mughees
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 505 - 514
  • [33] Facing the challenges of integrated design and project delivery
    Architecture H2A, Boise, ID, United States
    不详
    不详
    Strategic Plann Energy Environ, 2008, 1 (69-80): : 69 - 80
  • [34] A dedicated collaboration platform for Integrated Project Delivery
    Ma, Zhiliang
    Zhang, Dongdong
    Li, Jiulin
    AUTOMATION IN CONSTRUCTION, 2018, 86 : 199 - 209
  • [35] Integrated Project Delivery Method to Sustainable Construction
    Chen, Zixiang
    Liu, Ping
    Yang, Yunhui
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, INFORMATION AND MECHANICAL ENGINEERING (EMIM 2017), 2017, 76 : 777 - 781
  • [36] A research and development framework for integrated project delivery
    Arar, Ahmad J.
    Poirier, Erik
    Staub-French, Sheryl
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2025, 43 (02) : 85 - 112
  • [37] Barriers to adopting integrated project delivery practices
    Ma, Qiuwen
    Li, Shan
    Teo, Pei Xin
    Ling, Florence Yean Yng
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 4171 - 4191
  • [38] Facing the challenges of integrated design and project delivery
    Hellmund A.J.
    Van Den Wymelenberg K.G.
    Baker K.
    IEEE Engineering Management Review, 2010, 38 (02): : 8 - 14
  • [39] Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance
    Moon, Hyosoo
    Park, Moonseo
    Ahn, Yonghan
    Kwon, Nahyun
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (01)
  • [40] The Project Delivery System Rating Index (PDSRI) - An integrated scoring tool for assessing project readiness
    Cingle III, George
    Wachter, John C.
    Iron and Steel Technology, 2010, 7 (05): : 269 - 276