Facing the challenges of integrated design and project delivery

被引:0
|
作者
Hellmund, Amy J. [2 ]
Van Den Wymelenberg, Kevin G. [1 ]
Baker, Kenneth [2 ]
机构
[1] University of Idaho, Integrated Design Lab., Boise, United States
[2] K energy
关键词
Construction industry - Sustainable development - Environmental design - Commerce - Architectural design - Energy efficiency;
D O I
暂无
中图分类号
学科分类号
摘要
There is a new movement in the building industry that calls for sustainable planning and design. Energy costs are consistently rising and the cost of maintaining a building and its systems will eat away at profits the building owner expects to realize. In effect these seemingly simple concepts can make or break the success of a project for the owner. Additionally it is known that buildings consume more than 30 percent of the total energy and more than 60 percent of the electricity used in the US. Each day five billion gallons of potable water is used solely to flush toilets. A typical North American commercial construction project generates up to 2.5 pounds of solid waste per square foot of completed floor space. This is significant! This will change our landscape and the way we live if action is not taken to address this constant waste of resources. At an international scale, efforts such as Architecture 2030 and their 2030 Carbon Neutral Challenge and the United States Green Building Council's Leadership in Energy and Environment Design (LEED) rating system are two significant market drivers promoting change. Regionally, the Northwest Energy Efficiency Alliance's BetterBricks program has funded the Pacific Northwest University Design Lab Network (Lab Network) to promote market transformation for sustainable and energy efficient buildings. This article outlines how the owner and design team, along with the contractor and subcontactors (the team), were able to break through the old design and construction paradigm and enter into a challenging process called integrated design. Through this integrated design process and an integrated delivery method the Banner Bank, a LEED Platinum CS building was built. And through this process, the team members were transformed into more effective owners, designers, and builders.
引用
收藏
页码:36 / 47
相关论文
共 50 条
  • [1] Facing the challenges of integrated design and project delivery
    Architecture H2A, Boise, ID, United States
    不详
    不详
    Strategic Plann Energy Environ, 2008, 1 (69-80): : 69 - 80
  • [2] Facing the challenges of integrated design and project delivery
    Hellmund A.J.
    Van Den Wymelenberg K.G.
    Baker K.
    IEEE Engineering Management Review, 2010, 38 (02): : 8 - 14
  • [3] Challenges for Integrated Design and Delivery Solutions
    Owen, Robert
    Amor, Robert
    Palmer, Mark
    Dickinson, John
    Tatum, Clyde B.
    Kazi, Abdul Samad
    Prins, Matthijs
    Kiviniemi, Arto
    East, Bill
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2010, 6 (04) : 232 - 240
  • [4] Integrated Project Delivery Implementation Challenges in the Construction Industry
    Kahvandi, Zahra
    Saghatforoush, Ehsan
    ZareRavasan, Ahad
    Preece, Christopher
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (08): : 1672 - 1683
  • [5] Challenges for Integrated Design and Delivery Teams in AEC
    Singh, Vishal
    PRODUCT LIFECYCLE MANAGEMENT FOR SOCIETY (PLM 2013), 2013, 409 : 641 - 650
  • [6] Transforming project delivery: integrated project delivery
    Ashcraft, Howard
    OXFORD REVIEW OF ECONOMIC POLICY, 2022, 38 (02) : 369 - 384
  • [7] Application of Integrated Project Delivery (IPD) in the Middle East: Implementation and Challenges
    Sherif, Mohamed
    Abotaleb, Ibrahim
    Alqahtani, Fahad K.
    BUILDINGS, 2022, 12 (04)
  • [8] Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality
    Agbaxode, Peter Dodzi Kwasi
    Saghatforoush, Ehsan
    Dlamini, Sitsabo
    Korsah, John Kwesi
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2024, 14 (06) : 817 - 834
  • [9] FACING THE CHALLENGES OF TEMPORARY EXTERNAL IS PROJECT PERSONNEL
    Wu, Wilfred W.
    Zmud, Robert W.
    MIS QUARTERLY EXECUTIVE, 2010, 9 (01) : 13 - 21
  • [10] Industry facing product delivery, quality challenges
    Tippee, B
    OIL & GAS JOURNAL, 2005, 103 (07) : 33 - 34