Facing the challenges of integrated design and project delivery

被引:0
|
作者
Hellmund, Amy J. [2 ]
Van Den Wymelenberg, Kevin G. [1 ]
Baker, Kenneth [2 ]
机构
[1] University of Idaho, Integrated Design Lab., Boise, United States
[2] K energy
关键词
Construction industry - Sustainable development - Environmental design - Commerce - Architectural design - Energy efficiency;
D O I
暂无
中图分类号
学科分类号
摘要
There is a new movement in the building industry that calls for sustainable planning and design. Energy costs are consistently rising and the cost of maintaining a building and its systems will eat away at profits the building owner expects to realize. In effect these seemingly simple concepts can make or break the success of a project for the owner. Additionally it is known that buildings consume more than 30 percent of the total energy and more than 60 percent of the electricity used in the US. Each day five billion gallons of potable water is used solely to flush toilets. A typical North American commercial construction project generates up to 2.5 pounds of solid waste per square foot of completed floor space. This is significant! This will change our landscape and the way we live if action is not taken to address this constant waste of resources. At an international scale, efforts such as Architecture 2030 and their 2030 Carbon Neutral Challenge and the United States Green Building Council's Leadership in Energy and Environment Design (LEED) rating system are two significant market drivers promoting change. Regionally, the Northwest Energy Efficiency Alliance's BetterBricks program has funded the Pacific Northwest University Design Lab Network (Lab Network) to promote market transformation for sustainable and energy efficient buildings. This article outlines how the owner and design team, along with the contractor and subcontactors (the team), were able to break through the old design and construction paradigm and enter into a challenging process called integrated design. Through this integrated design process and an integrated delivery method the Banner Bank, a LEED Platinum CS building was built. And through this process, the team members were transformed into more effective owners, designers, and builders.
引用
收藏
页码:36 / 47
相关论文
共 50 条
  • [21] Environmental challenges facing the Central Artery/Tunnel Project
    Ionata, EW
    NORTH AMERICAN TUNNELING '98, 1998, : 199 - 203
  • [22] Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course
    Al Junid, Syed Abdul Mutalib
    Hussaini, Yusnira
    Osman, Fairul Nazmie
    Razak, Abdul Hadi Abdul
    Idros, Mohd Faizul Md
    Halim, Abdul Karimi
    INTERNATIONAL CONFERENCE ON APPLIED ELECTRONIC AND ENGINEERING 2017 (ICAEE2017), 2018, 341
  • [23] Ove Arup's total design, integrated project delivery, and the role of the engineer
    Uihlein, M. S.
    ARCHITECTURAL SCIENCE REVIEW, 2016, 59 (02) : 102 - 113
  • [24] Integrated Project Controlling Management under Design-Build Delivery System
    Xiu, Xiao-bei
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 194 - 198
  • [25] Integrated project delivery (IPD) for maximizing design and construction considerations regarding sustainability
    Jones, Barry
    2ND INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS, 2014, 95 : 528 - 538
  • [26] Design bid build to integrated project delivery: Strategic formulation to increase partnering
    Sari, Endah Murtiana
    Irawan, Agustinus Purna
    Wibowo, Mochamad Agung
    Purwanto, S. K.
    Sutawidjaya, Ahmad Hidayat
    Dewi, Maya Puspita
    Santoso, Joseph Teguh
    JOURNAL OF INFRASTRUCTURE POLICY AND DEVELOPMENT, 2023, 8 (01)
  • [27] Structuring approach for Integrated Project Delivery
    Haghsheno, S.
    Baier, C.
    Budau, M. R. -D.
    Miguel, A. Schilling
    Talmon, P.
    Frantz, L.
    BAUINGENIEUR, 2022, 97 (03): : 63 - 76
  • [28] Integrated Project Delivery: The Obstacles of Implementation
    Fish, Amanda J.
    Keen, Julia
    ASHRAE TRANSACTIONS 2012, VOL 118, PT 1, 2012, 118 : 90 - 97
  • [29] Last planner and integrated project delivery
    Cho, Seongkyun
    Ballard, Glenn
    Lean Construction Journal, 2011, 2011 : 67 - 73
  • [30] EDA challenges facing future microprocessor design
    Kam, T
    Rawat, S
    Kirkpatrick, D
    Roy, R
    Spirakis, GS
    Sherwani, N
    Peterson, C
    IEEE TRANSACTIONS ON COMPUTER-AIDED DESIGN OF INTEGRATED CIRCUITS AND SYSTEMS, 2000, 19 (12) : 1498 - 1506