Facing the challenges of integrated design and project delivery

被引:0
|
作者
Hellmund, Amy J. [2 ]
Van Den Wymelenberg, Kevin G. [1 ]
Baker, Kenneth [2 ]
机构
[1] University of Idaho, Integrated Design Lab., Boise, United States
[2] K energy
关键词
Construction industry - Sustainable development - Environmental design - Commerce - Architectural design - Energy efficiency;
D O I
暂无
中图分类号
学科分类号
摘要
There is a new movement in the building industry that calls for sustainable planning and design. Energy costs are consistently rising and the cost of maintaining a building and its systems will eat away at profits the building owner expects to realize. In effect these seemingly simple concepts can make or break the success of a project for the owner. Additionally it is known that buildings consume more than 30 percent of the total energy and more than 60 percent of the electricity used in the US. Each day five billion gallons of potable water is used solely to flush toilets. A typical North American commercial construction project generates up to 2.5 pounds of solid waste per square foot of completed floor space. This is significant! This will change our landscape and the way we live if action is not taken to address this constant waste of resources. At an international scale, efforts such as Architecture 2030 and their 2030 Carbon Neutral Challenge and the United States Green Building Council's Leadership in Energy and Environment Design (LEED) rating system are two significant market drivers promoting change. Regionally, the Northwest Energy Efficiency Alliance's BetterBricks program has funded the Pacific Northwest University Design Lab Network (Lab Network) to promote market transformation for sustainable and energy efficient buildings. This article outlines how the owner and design team, along with the contractor and subcontactors (the team), were able to break through the old design and construction paradigm and enter into a challenging process called integrated design. Through this integrated design process and an integrated delivery method the Banner Bank, a LEED Platinum CS building was built. And through this process, the team members were transformed into more effective owners, designers, and builders.
引用
收藏
页码:36 / 47
相关论文
共 50 条
  • [41] Winter chiller alternative project using integrated project delivery
    Parolise, Amanda
    Engineered Systems, 2019, 36 (10): : 10 - 12
  • [42] Evaluating Integrated Project Delivery Using the Project Quarterback Rating
    El Asmar, Mounir
    Hanna, Awad S.
    Loh, Wei-Yin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (01)
  • [43] Adoption of Integrated Project Delivery Practices for Superior Project Performance
    Ling, Florence Y. Y.
    Teo, Pei Xin
    Li, Shan
    Zhang, Zhe
    Ma, Qiuwen
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (04)
  • [44] Rational vector design for efficient non-viral gene delivery: Challenges facing the use of plasmid DNA
    Mairhofer, Juergen
    Grabherr, Reingard
    MOLECULAR BIOTECHNOLOGY, 2008, 39 (02) : 97 - 104
  • [45] Rational Vector Design for Efficient Non-viral Gene Delivery: Challenges Facing the Use of Plasmid DNA
    Juergen Mairhofer
    Reingard Grabherr
    Molecular Biotechnology, 2008, 39 : 97 - 104
  • [47] Integrated Design and Delivery Solutions
    Prins, Matthijs
    Owen, Robert
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2010, 6 (04) : 227 - 231
  • [48] Trust and Control in the context of Integrated Project Delivery
    Haghsheno, S.
    Vaeth, C.
    Schmidt, J-S.
    Hanau, A.
    Budau, M. R. -D.
    Frantz, L.
    BAUINGENIEUR, 2023, 98 (06): : 197 - 206
  • [49] Unveiling Embedded Risks in Integrated Project Delivery
    Ma, Qiuwen
    Li, Shan
    Cheung, Sai On
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (01)
  • [50] Contractual Guidelines for Promoting Integrated Project Delivery
    Ahmed, Muaz O.
    Nabi, Mohamad Abdul
    El-adaway, Islam H.
    Caranci, Dustin
    Eberle, Jackson
    Hawkins, Zachary
    Sparrow, Ross
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (11)