Structural model of cost overrun factors affecting Pakistani construction projects

被引:1
|
作者
Memon, Aftab Hameed [1 ]
Memon, Abdul Qadir [1 ]
Memon, Muneeb Ayub [1 ]
Sahito, Jam Shahzeb Khan [1 ]
机构
[1] Quaid Awam Univ Engn Sci & Technol, Dept Civil Engn, Nawabshah, Pakistan
关键词
Cost Performance; Cost Overruns; Construction; PLS-SEM Structural Equation; Modeling; Pakistan; INFRASTRUCTURE PROJECTS; DELAYS; INDUSTRY; TIME;
D O I
10.22581/muet1982.2302.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorize the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.
引用
收藏
页码:108 / 123
页数:16
相关论文
共 50 条
  • [41] Preliminary Study on Causative Factors Leading to Construction Cost Overrun
    Memon, Aftab Hameed
    Rahman, Ismail Abdul
    Azis, Ade Asmi Abdul
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2011, 2 (01): : 57 - 71
  • [42] Causative factors of cost overrun in highway projects of Sindh province of Pakistan
    Sohu, S.
    Halid, A.
    Nagapan, S.
    Fattah, A.
    Latif, I.
    Ullah, K.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [43] Evaluation of Cost Overrun in Construction Projects during COVID-19 Pandemic
    Adepu, Nikhitha
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Loganathan, Karthikeyan
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (01)
  • [44] Critical factors affecting cost performance: a case of Ethiopian public construction projects
    Sinesilassie, E. G.
    Tabish, S. Z. S.
    Jha, K. N.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (02) : 108 - 119
  • [45] Factors affecting cost estimate accuracy: Evidence from Palestinian construction projects
    Mahamid, Ibrahim
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2015, 10 (02) : 117 - 125
  • [46] Factors affecting time and cost trade-off in multiple construction projects
    Hasan, Musaab Falih
    Mohammed, Sawsan Rasheed
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 549 - 561
  • [47] Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects
    Ghazal, Mai Monir
    Hammad, Ahmed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (09) : 1632 - 1646
  • [48] Categorization of potential project cost overrun factors in construction industry
    Karunakaran, P.
    Abdullah, A. H.
    Nagapan, S.
    Sohu, S.
    Kasvar, K. K.
    4TH INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING FOR SUSTAINABILITY (ICONCEES 2017), 2018, 140
  • [49] Common Risks Affecting Time Overrun in Road Construction Projects in Palestine: Contractors' Perspective
    Mahamid, Ibrahim
    CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (02): : 45 - 53
  • [50] Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation
    Sanchez, Omar
    Castaneda, Karen
    Herrera, Rodrigo F.
    Pellicer, Eugenio
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 472 - 482