Structural model of cost overrun factors affecting Pakistani construction projects

被引:1
|
作者
Memon, Aftab Hameed [1 ]
Memon, Abdul Qadir [1 ]
Memon, Muneeb Ayub [1 ]
Sahito, Jam Shahzeb Khan [1 ]
机构
[1] Quaid Awam Univ Engn Sci & Technol, Dept Civil Engn, Nawabshah, Pakistan
关键词
Cost Performance; Cost Overruns; Construction; PLS-SEM Structural Equation; Modeling; Pakistan; INFRASTRUCTURE PROJECTS; DELAYS; INDUSTRY; TIME;
D O I
10.22581/muet1982.2302.12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorize the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.
引用
收藏
页码:108 / 123
页数:16
相关论文
共 50 条
  • [31] Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects
    Pham, Hai
    Luu, Truong-Van
    Kim, Soo-Yong
    Vien, Duc-Thinh
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (04) : 1029 - 1036
  • [32] Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang
    Haslinda, A. Nor
    Xian, T. Wei
    Norfarahayu, K.
    Hanafi, R. Muhamad
    Fikri, H. Muhammad
    INTERNATIONAL SEMINAR ON MATHEMATICS AND PHYSICS IN SCIENCES AND TECHNOLOGY 2017 (ISMAP 2017), 2018, 995
  • [33] Study on factors affecting the performance of construction projects and developing a cost prediction model using ANN
    Alias, Melba
    Dhanya, R.
    Ramasamy, Ganapathy
    International Journal of Earth Sciences and Engineering, 2015, 8 (05): : 2189 - 2194
  • [34] Managing Major Cost-Overrun Risks in Construction Projects in China
    Wang Jiayuan
    Zou, X. W.
    PROCEEDINGS OF CRIOCM 2008 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCES OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2008, : 238 - 243
  • [35] Critical success factors for cost overrun minimization in public construction projects in developing countries: the case of Ghana
    Nuako, Francis
    Ghansah, Frank Ato
    Adusei, Thomas
    CONSTRUCTION INNOVATION-ENGLAND, 2024,
  • [36] Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
    Al Amri, Tariq
    Marey-Perez, Manuel
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 87 - 102
  • [37] Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects
    Hai Pham
    Truong-Van Luu
    Soo-Yong Kim
    Duc-Thinh Vien
    KSCE Journal of Civil Engineering, 2020, 24 : 1029 - 1036
  • [38] Major Factors Affecting Construction Waste Management in Infrastructure Projects Using Structural Equation Model
    Naji, Khalid K.
    Gunduz, Murat
    Hamaidi, Munther Farouq
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (10)
  • [39] Modeling cost overrun in building construction projects using the interpretive structural modeling approach: a developing country perspective
    Shoar, Shahab
    Yiu, Tak Wing
    Payan, Shamsi
    Parchamijalal, Majid
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (02) : 365 - 392
  • [40] Mitigation Measures for Significant Factors Instigating Cost Overrun in Highway Projects
    Sohu, Samiullah
    Bin Abdullah, Abd Halid
    Memon, Bashir Ahmed
    Nagapan, Sasitharan
    Bhatti, Nadeem Ul Kareem
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (10): : 2338 - 2344