Optimizing of Discrete Time- cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm

被引:2
|
作者
Albayrak, Gulcag [1 ]
机构
[1] Eskisehir Osmangazi Univ, Dept Civil Engn, Fac Engn & Architecture, Meselik Campus, TR-26040 Eskisehir, Turkiye
来源
关键词
construction management; Jaya algorithm; metaheuristic method; optimization; multi-objective modelling; ROBUST OPTIMIZATION; CASH FLOW; SEARCH;
D O I
10.3311/PPci.22156
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a novel algorithm to optimize the discrete time-cost trade-off problem (DTCTP) in construction projects. As DTCTP is assumed NP-hard, the new metaheuristic models are investigated to contribute for decision-making of project managers. DTCTP can be modelled as multi-mode to represent real-life problems more practical. According to the model, the project activities have at least two or more durations and cost alternative modes. For solving this problem effectively, a novel optimization metaheuristic method named Advanced Jaya Algorithm (A-JA) is proposed, which is generated from Jaya Algorithm (JA). The benchmark function tests are applied to verify the model with other well-known metaheuristic methods. The key weakness of the base algorithm JA is that, it has unstable solution accuracy and low likelihood of escaping local optimums. According to the results, A-JA considerably improves these areas. Two case studies of DTCTP are carried out after verification to demonstrate the effectiveness and efficiency of the proposed algorithm in comparison with JA and three well-known methods. The results of A-JA are found to be more powerful than the base algorithm JA and the benchmark algorithms. The proposed method achieves the Pareto fronts to help decision makers to make trade-off between the objectives and choose the optimum solution considering on their preference.
引用
收藏
页码:806 / 818
页数:13
相关论文
共 50 条
  • [41] Solution of discrete time-cost trade-off problem with adaptive search domain
    Bettemir, Onder Halis
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025, 32 (02) : 1032 - 1052
  • [42] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [43] New computational results on the discrete time/cost trade-off problem in project networks
    Demeulemeester, E
    De Reyck, B
    Foubert, B
    Herroelen, W
    Vanhoucke, M
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (11) : 1153 - 1163
  • [44] Solution of discrete time-cost trade-off problem with adaptive search domain
    Bettemir, Onder Halis
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025, 32 (02) : 1032 - 1052
  • [45] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [46] A Genetic Algorithm to Time- Cost Trade off in Project Scheduling
    Hooshyar, B.
    Rahmani, A.
    Shenasa, M.
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 3081 - +
  • [47] Discrete Time-Cost-Environment Trade-Off Problem and Its Application to a Large-Scale Construction Project
    Zheng, Huan
    Zhong, Lin
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 1375 - 1382
  • [48] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects
    Gülçağ Albayrak
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
  • [49] A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project
    Zheng, Huan
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2018, : 1709 - 1721
  • [50] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111