Identification of Residual Development Efforts in Agile Ramp-Up Production

被引:0
|
作者
Bergs, Thomas [1 ]
Apelt, Sebastian [1 ]
Becker, Malte [1 ]
Beckers, Alexander [1 ]
Barth, Sebastian [1 ]
机构
[1] Rhein Westfal TH Aachen, Chair Mfg Technol, Lab Machine Tools & Prod Engn WZL, Aachen, Germany
关键词
Agile ramp-up production; Technology planning; Uncertainties; Residual development efforts; Manufacturing sequence;
D O I
10.1007/978-3-031-15602-1_1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Agile product development is increasingly finding its way into the development of physical products. The subsequent transfer of a planned and still unstable manufacturing process into stable series production after the design freeze is the goal of ramp-up production, but confronts manufacturing companies with different challenges. A currently high level of changes to the product geometry and the planned manufacturing sequence due to not achieved requirements in late phases of the ramp-up production (Residual Development Efforts-RDE) results in time-consuming and cost-intensive changes to the product and manufacturing sequence, which leads to failure to achieve ramp-up targets. The goal of current research is therefore to increase the agility of ramp-ups and to integrate the ramp-up production into the phase of agile product development. This offers the potential to use the increased dynamics of the product development process and the knowledge already generated for the validation and stabilization of the manufacturing process. However, due to the integration of ramp-up production into product development, there are additional far-reaching effects of product and technology uncertainties prevalent in agile product development on the design of agile ramp-up production. Additional uncertainties regarding the product geometry due to non-finalized designs and the resulting uncertainties regarding the probability of use and achievement of the requirements of the manufacturing technologies initially result in additional residual development efforts. Furthermore, the interactions between the manufacturing technologies in the manufacturing sequence are thus subject to additional uncertainties, which also leads to increased RDEs. To meet this challenge, it is necessary to analyze prevailing uncertainties and predict their impact on potential changes in agile ramp-up production. Therefore, a methodology is presented, which enables the analysis of product and technology uncertainties and thus the identification of product and process-related changes (RDE) in agile ramp-up production.
引用
收藏
页码:3 / 15
页数:13
相关论文
共 50 条
  • [21] Interface modeling and analysis during production ramp-up
    Surbier, L.
    Alpan, G.
    Blanco, E.
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2010, 2 (04) : 247 - 254
  • [22] Simulation of personnel requirements during production ramp-up
    Lanza, Gisela
    Sauer, Anna
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2012, 6 (4-5): : 395 - 402
  • [23] Location-based production ramp-up in networks
    Verhaelen B.
    Treber S.
    Häfner B.
    Lanza G.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2019, 114 (03): : 110 - 114
  • [24] Managing agile ramp-up projects in manufacturing-Status quo and recommendations
    Heraud, Juliette
    Medini, Khaled
    Andersen, Ann-Louise
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2023, 45 : 125 - 137
  • [25] Optimal production ramp-up in the smartphone manufacturing industry
    Wang, Lu
    Ai, Wenqing
    Deng, Tianhu
    Shen, Zuo-Jun M.
    Hong, Changjing
    NAVAL RESEARCH LOGISTICS, 2020, 67 (08) : 685 - 704
  • [26] Holistic approach for production ramp-up in automotive industry
    Schuh, G
    Desoi, JC
    Tücks, G
    Advances in Integrated Design and Manufacturing in Mechanical Engineering, 2005, : 255 - 268
  • [27] Knowledge management for ramp-up - Approach for knowledge management for ramp-up in the automotive industry
    Thiebus, Sven
    Berger, Ulrich
    Kretzschmann, Ralf
    ICEIS 2006: Proceedings of the Eighth International Conference on Enterprise Information Systems: ARTIFICIAL INTELLIGENCE AND DECISION SUPPORT SYSTEMS, 2006, : 323 - 330
  • [28] Production planning for a ramp-up process with learning in production and growth in demand
    Glock, Christoph H.
    Jaber, Mohamad Y.
    Zolfaghari, Saeed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5707 - 5718
  • [29] Ramp-up Failure Rate - Implementation of a Quality Ratio in Ramp-up Management.
    Herrmann, Christoph
    Wenda, Andreas
    Bruns, Heinz
    Weinhonig, Katja
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2009, 104 (06): : 454 - 458
  • [30] On the future of ramp-up management
    Schmitt, Robert
    Heine, Ina
    Jiang, Ruth
    Giedziella, Felix
    Basse, Felix
    Voet, Hanno
    Lu, Stephen
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2018, 23 : 217 - 225