Identification of Residual Development Efforts in Agile Ramp-Up Production

被引:0
|
作者
Bergs, Thomas [1 ]
Apelt, Sebastian [1 ]
Becker, Malte [1 ]
Beckers, Alexander [1 ]
Barth, Sebastian [1 ]
机构
[1] Rhein Westfal TH Aachen, Chair Mfg Technol, Lab Machine Tools & Prod Engn WZL, Aachen, Germany
关键词
Agile ramp-up production; Technology planning; Uncertainties; Residual development efforts; Manufacturing sequence;
D O I
10.1007/978-3-031-15602-1_1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Agile product development is increasingly finding its way into the development of physical products. The subsequent transfer of a planned and still unstable manufacturing process into stable series production after the design freeze is the goal of ramp-up production, but confronts manufacturing companies with different challenges. A currently high level of changes to the product geometry and the planned manufacturing sequence due to not achieved requirements in late phases of the ramp-up production (Residual Development Efforts-RDE) results in time-consuming and cost-intensive changes to the product and manufacturing sequence, which leads to failure to achieve ramp-up targets. The goal of current research is therefore to increase the agility of ramp-ups and to integrate the ramp-up production into the phase of agile product development. This offers the potential to use the increased dynamics of the product development process and the knowledge already generated for the validation and stabilization of the manufacturing process. However, due to the integration of ramp-up production into product development, there are additional far-reaching effects of product and technology uncertainties prevalent in agile product development on the design of agile ramp-up production. Additional uncertainties regarding the product geometry due to non-finalized designs and the resulting uncertainties regarding the probability of use and achievement of the requirements of the manufacturing technologies initially result in additional residual development efforts. Furthermore, the interactions between the manufacturing technologies in the manufacturing sequence are thus subject to additional uncertainties, which also leads to increased RDEs. To meet this challenge, it is necessary to analyze prevailing uncertainties and predict their impact on potential changes in agile ramp-up production. Therefore, a methodology is presented, which enables the analysis of product and technology uncertainties and thus the identification of product and process-related changes (RDE) in agile ramp-up production.
引用
收藏
页码:3 / 15
页数:13
相关论文
共 50 条
  • [41] Rapid production ramp-up capability: a collaborative supply network perspective
    Li, Hui-Hong J. K.
    Shi, Yong Jiang
    Gregory, Mike
    Tan, Kim Hua
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (10) : 2999 - 3013
  • [42] KMDL FOR INNOVATION AND PRODUCTION RAMP-UP PROCESS EVALUATION A Case Study
    Bahrs, Julian
    Heinze, Priscilla
    KMIS 2009: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON KNOWLEDGE MANAGEMENT AND INFORMATION SHARING, 2009, : 280 - 283
  • [43] A Symbiotic Human-Machine Learning Approach for Production Ramp-up
    Doltsinis, Stefanos
    Ferreira, Pedro
    Lohse, Niels
    IEEE TRANSACTIONS ON HUMAN-MACHINE SYSTEMS, 2018, 48 (03) : 229 - 240
  • [44] Decision support models for production ramp-up: a systematic literature review
    Glock, Christoph H.
    Grosse, Eric H.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (21) : 6637 - 6651
  • [45] Ramp-up Journey of New Hires
    Rastogi, Ayushi
    Thummalapenta, Suresh
    Zimmermann, Thomas
    Nagappan, Nachiappan
    Czerwonka, Jacek
    2015 ACM/IEEE INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING AND MEASUREMENT (ESEM), 2015, : 96 - 105
  • [46] Automated Production Ramp-up Through Self-Learning Systems
    Ennen, Philipp
    Reuter, Sebastian
    Vossen, Rene
    Jeschke, Sabina
    3RD ICRM 2016 INTERNATIONAL CONFERENCE ON RAMP-UP MANAGEMENT, 2016, 51 : 57 - 62
  • [47] Collaborative ramp-up planning and controlling
    Hinrichs, J
    Rittscher, J
    Laakmann, F
    Hellingrath, B
    2004 2ND IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS: COLLABORATIVE AUTOMATION - ONE KEY FOR INTELLIGENT INDUSTRIAL ENVIRONMENTS, 2004, : 180 - 183
  • [48] Yield improvement and ramp-up to production of advanced CMOS technologies interconnects
    Gonella, Roberto
    2011 IEEE INTERNATIONAL INTERCONNECT TECHNOLOGY CONFERENCE AND MATERIALS FOR ADVANCED METALLIZATION (IITC/MAM), 2011,
  • [49] Applying lean production principles to facilities design of ramp-up factories
    Low, Sui Pheng
    Gao, Shang
    Tiong, Kai Lin
    FACILITIES, 2015, 33 (5-6) : 280 - 301
  • [50] Framework for Target Classification and Strategy Derivation during Production Ramp-up
    Haller, Julian
    Beckschulte, Sebastian
    Padron, Marcos
    Quoc Hao Ngo
    Schmitt, Robert H.
    2023 IEEE INTERNATIONAL SYSTEMS CONFERENCE, SYSCON, 2023,