Identification of Residual Development Efforts in Agile Ramp-Up Production

被引:0
|
作者
Bergs, Thomas [1 ]
Apelt, Sebastian [1 ]
Becker, Malte [1 ]
Beckers, Alexander [1 ]
Barth, Sebastian [1 ]
机构
[1] Rhein Westfal TH Aachen, Chair Mfg Technol, Lab Machine Tools & Prod Engn WZL, Aachen, Germany
关键词
Agile ramp-up production; Technology planning; Uncertainties; Residual development efforts; Manufacturing sequence;
D O I
10.1007/978-3-031-15602-1_1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Agile product development is increasingly finding its way into the development of physical products. The subsequent transfer of a planned and still unstable manufacturing process into stable series production after the design freeze is the goal of ramp-up production, but confronts manufacturing companies with different challenges. A currently high level of changes to the product geometry and the planned manufacturing sequence due to not achieved requirements in late phases of the ramp-up production (Residual Development Efforts-RDE) results in time-consuming and cost-intensive changes to the product and manufacturing sequence, which leads to failure to achieve ramp-up targets. The goal of current research is therefore to increase the agility of ramp-ups and to integrate the ramp-up production into the phase of agile product development. This offers the potential to use the increased dynamics of the product development process and the knowledge already generated for the validation and stabilization of the manufacturing process. However, due to the integration of ramp-up production into product development, there are additional far-reaching effects of product and technology uncertainties prevalent in agile product development on the design of agile ramp-up production. Additional uncertainties regarding the product geometry due to non-finalized designs and the resulting uncertainties regarding the probability of use and achievement of the requirements of the manufacturing technologies initially result in additional residual development efforts. Furthermore, the interactions between the manufacturing technologies in the manufacturing sequence are thus subject to additional uncertainties, which also leads to increased RDEs. To meet this challenge, it is necessary to analyze prevailing uncertainties and predict their impact on potential changes in agile ramp-up production. Therefore, a methodology is presented, which enables the analysis of product and technology uncertainties and thus the identification of product and process-related changes (RDE) in agile ramp-up production.
引用
收藏
页码:3 / 15
页数:13
相关论文
共 50 条
  • [31] Production ramp-up in European automotive production systems: a performance analysis
    Viles, Elisabeth
    Bulto, Ramon
    Mateo, Ricardo
    Jurburg, Daniel
    PRODUCTION PLANNING & CONTROL, 2021, 32 (01) : 34 - 51
  • [32] Phase-out integrated ramp-up production. Challenges of planning manufacturing systems in the phase-out integrated ramp-up production
    Bergs, Thomas
    Apelt, Sebastian
    Rey, Jan
    Trauth, Daniel
    WT Werkstattstechnik, 2019, 109 (06): : 452 - 456
  • [33] Production quality improvement during manufacturing systems ramp-up
    Colledani, M.
    Tolio, T.
    Yemane, A.
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2018, 23 : 197 - 206
  • [34] Investigating the Impact of Product Volume and Variety on Production Ramp-Up
    Andersen, Ann-Louise
    Bejlegaard, Mads
    Brunoe, Thomas D.
    Nielsen, Kjeld
    MANAGING COMPLEXITY, 2017, : 421 - 434
  • [35] Towards a Conceptual Model for Enhancing Efficiency and Collaboration in Agile Ramp-Up Projects Planning
    Jarrar, Qussay
    Taleb, Cheikh S-A-M
    Kadkhoda-Ahmadi, Shervin
    Medini, Khaled
    NAVIGATING UNPREDICTABILITY: COLLABORATIVE NETWORKS IN NON-LINEAR WORLDS, PRO-VE 2024, PT I, 2024, 726 : 336 - 348
  • [36] Hismelt Plant Ramp-Up
    Goodman, Neil
    Dry, Rod
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 1228 - 1233
  • [37] Supplier Management by Ramp-up Competent Production Systems Design
    Heins, Michael
    Klemke, Tim
    Schulze, Candy Patrick
    PPS MANAGEMENT, 2008, 13 (04): : 29 - 32
  • [38] Don't wait for ramp-up: Simulate production now
    Palmer, Dean
    Manufacturing Computer Solutions, 2002, 8 (08): : 39 - 41
  • [39] Don't wait for ramp-up: Simulate production now
    Palmer, Dean
    Manufacturing Computer Solutions, 2002, 8 (09): : 39 - 41
  • [40] Development of a ramp-up model for the lean startup – part 1
    Maier R.R.
    Berlin R.M.
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2019, 114 (04): : 173 - 177