Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development

被引:0
|
作者
Amir Prasad Behera [1 ]
Mayank Chauhan [2 ]
Gaurav Shrivastava [3 ]
Prachi Singh [4 ]
Jyoti Shukla [5 ]
Krushna Chandra Sethi [6 ]
机构
[1] Centurion University of Technology and Management,
[2] Shri Venkateshwara University,undefined
[3] Vikrant University,undefined
[4] Madhav Institute of Technology and Science,undefined
[5] Swami Karpatri Ji Government PG College Raniganj,undefined
[6] Centurion University of Technology and Management,undefined
关键词
Sustainable development; Construction industry; NSGA-III; Time–cost–carbon emission trade-off (TCCET); Pareto-efficient solutions; Sustainable construction practices;
D O I
10.1007/s42107-024-01176-9
中图分类号
学科分类号
摘要
The construction industry faces the critical challenge of balancing project time, cost, and carbon emissions to achieve sustainable development. This study introduces a Time–Cost–Carbon Emission Trade-Off (TCCET) model, optimized using the Non-dominated Sorting Genetic Algorithm III (NSGA-III), to address these conflicting objectives. The TCCET model evaluates various execution modes for construction activities, such as groundwork, excavation, footing, formwork, and finishing, taking into account their respective impacts on time, budget, and carbon emissions. By applying NSGA-III, the model generates a set of Pareto-optimal solutions, offering decision-makers diverse trade-offs among these objectives. A practical case study demonstrates the model’s effectiveness in real-world scenarios, yielding flexible and efficient solutions that support informed decision-making in construction management. Comparative analysis with existing optimization models and sensitivity analysis highlight the superior performance of NSGA-III in addressing time, cost, and environmental impact simultaneously. This study’s findings emphasize the potential of NSGA-III to guide sustainable construction practices, significantly reducing environmental footprints without compromising project timelines or costs. The developed framework aligns with global sustainable development goals, providing valuable insights for the construction industry’s transition to sustainable practices.
引用
收藏
页码:73 / 87
页数:14
相关论文
共 50 条
  • [21] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [22] Multiobjective Trade-Off Optimization of Time, Cost, Quality, and Carbon Emission in the Building Construction Stage
    Wang, Haixin
    Chen, Xin
    Wang, Jiaqi
    Guan, Wenfeng
    Wei, Shengsong
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (04)
  • [23] A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development
    Hashemi, Reza
    Shahbandarzadeh, Hamid
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (03) : 323 - 330
  • [24] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [25] Time Cost Trade-Off Problem Using Intuitionistic Fuzzy with Real Time Application in the Field of Construction
    Priyadharshini, S.
    Deepa, G.
    CONTEMPORARY MATHEMATICS, 2024, 5 (03):
  • [26] Using ant colony algorithm to solve construction time-cost trade-off problem
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    不详
    Zhejiang Daxue Xuebao (Gongxue Ban), 2007, 1 (176-180):
  • [27] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [28] CONSTRUCTION TIME-COST TRADE-OFF ANALYSIS USING LP/IP HYBRID METHOD
    LIU, L
    BURNS, SA
    FENG, CW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 446 - 454
  • [29] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [30] Optimizing Trade-Off Between Cost and Performance of Data Transfers Using Bandwidth Reservation in Dedicated Networks
    Zuo, Liudong
    Zhu, Michelle M.
    Chang, Chia-Han
    JOURNAL OF NETWORK AND SYSTEMS MANAGEMENT, 2019, 27 (01) : 166 - 187