Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development

被引:0
|
作者
Amir Prasad Behera [1 ]
Mayank Chauhan [2 ]
Gaurav Shrivastava [3 ]
Prachi Singh [4 ]
Jyoti Shukla [5 ]
Krushna Chandra Sethi [6 ]
机构
[1] Centurion University of Technology and Management,
[2] Shri Venkateshwara University,undefined
[3] Vikrant University,undefined
[4] Madhav Institute of Technology and Science,undefined
[5] Swami Karpatri Ji Government PG College Raniganj,undefined
[6] Centurion University of Technology and Management,undefined
关键词
Sustainable development; Construction industry; NSGA-III; Time–cost–carbon emission trade-off (TCCET); Pareto-efficient solutions; Sustainable construction practices;
D O I
10.1007/s42107-024-01176-9
中图分类号
学科分类号
摘要
The construction industry faces the critical challenge of balancing project time, cost, and carbon emissions to achieve sustainable development. This study introduces a Time–Cost–Carbon Emission Trade-Off (TCCET) model, optimized using the Non-dominated Sorting Genetic Algorithm III (NSGA-III), to address these conflicting objectives. The TCCET model evaluates various execution modes for construction activities, such as groundwork, excavation, footing, formwork, and finishing, taking into account their respective impacts on time, budget, and carbon emissions. By applying NSGA-III, the model generates a set of Pareto-optimal solutions, offering decision-makers diverse trade-offs among these objectives. A practical case study demonstrates the model’s effectiveness in real-world scenarios, yielding flexible and efficient solutions that support informed decision-making in construction management. Comparative analysis with existing optimization models and sensitivity analysis highlight the superior performance of NSGA-III in addressing time, cost, and environmental impact simultaneously. This study’s findings emphasize the potential of NSGA-III to guide sustainable construction practices, significantly reducing environmental footprints without compromising project timelines or costs. The developed framework aligns with global sustainable development goals, providing valuable insights for the construction industry’s transition to sustainable practices.
引用
收藏
页码:73 / 87
页数:14
相关论文
共 50 条
  • [41] Trade-off between service time and carbon emissions for safety stock placement in multi-echelon supply chains
    Ni, Wenjun
    Shu, Jia
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (22) : 6701 - 6718
  • [42] Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
    Azaron, Amir
    Tavakkoli-Moghaddam, Reza
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) : 1186 - 1200
  • [43] A prediction-based model to optimize construction programs: Considering time, cost, energy consumption, and CO2 emissions trade-off
    Razi, Niloofar
    Ansari, Ramin
    JOURNAL OF CLEANER PRODUCTION, 2024, 445
  • [44] Time-cost-quality trade-off software by using simplified Genetic algorithm for typical-repetitive construction projects
    Abd El Razek, Refaat H.
    Diab, Ahmed M.
    Hafez, Sherif M.
    Aziz, Remon F.
    World Academy of Science, Engineering and Technology, 2010, 61 : 312 - 321
  • [45] Multimodal optimization for time-cost trade-off in construction projects using a novel hybrid method based on FA and PSO
    Arlbayrak, Gulcag
    Ozdemir, Ilker
    REVISTA DE LA CONSTRUCCION, 2018, 17 (02): : 304 - 318
  • [46] Multi-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm
    Narayanan, A. Sathya
    Suribabu, C. R.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2014, 8 (04) : 375 - 392
  • [47] A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project
    Mungle, Santosh
    Benyoucef, Lyes
    Son, Young-Jun
    Tiwari, M. K.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2013, 26 (08) : 1953 - 1966
  • [48] Development of time-cost trade-off optimization model for Indian highway construction projects using non-dominated sorting genetic algorithm-II methodology
    Kandipilli Mehar Kumar
    Deepanshu Agrawal
    Vinod Kumar Vishwakarma
    Mohammad Azim Eirgash
    Asian Journal of Civil Engineering, 2024, 25 (8) : 5975 - 5988
  • [49] Sustainable milling of Ti-6Al-4V: A trade-off between energy efficiency, carbon emissions and machining characteristics under MQL and cryogenic environment
    Jamil, Muhammad
    Zhao, Wei
    He, Ning
    Gupta, Munish Kumar
    Sarikaya, Murat
    Khan, Aqib Mashood
    Sanjay, M. R.
    Siengchin, Suchart
    Pimenov, Danil Yu
    JOURNAL OF CLEANER PRODUCTION, 2021, 281
  • [50] The Trade-off Between Poverty Reduction and Carbon Emissions, and the Role of Economic Growth and Inequality: An Empirical Cross-Country Analysis Using a Novel Indicator
    Daniele Malerba
    Social Indicators Research, 2020, 150 : 587 - 615