Development of resource-constrained time-cost trade-off optimization model for ventilation system retrofitting using NSGA-III

被引:0
|
作者
Apurva Sharma [1 ]
Anupama Sharma [1 ]
机构
[1] Maulana Azad National Institute of Technology,
关键词
Ventilation system retrofitting; NSGA-III optimization; Multi-objective optimization; Sustainable construction;
D O I
10.1007/s42107-024-01138-1
中图分类号
学科分类号
摘要
The effective retrofitting of ventilation systems is essential for enhancing indoor air quality, energy efficiency, noise reduction, maintenance ease, aesthetics, and reducing the carbon footprint of buildings. This study presents the development of a resource-constrained time–cost trade-off optimization model for ventilation system retrofitting using the non-dominated sorting genetic algorithm III (NSGA-III). The model integrates various retrofitting options, categorized into ventilation capacity enhancement, energy efficiency improvements, air quality enhancements, noise reduction measures, maintenance facilitation, aesthetics improvements, and carbon footprint reduction strategies, each characterized by its retrofitting duration and associated cost. The objective is to identify optimal combinations of retrofitting options that minimize project completion time and cost while adhering to resource constraints. The NSGA-III optimization process generates Pareto-efficient solutions, providing decision-makers with a spectrum of optimal trade-offs. Model validation and performance metrics-based comparative analysis between the developed and existing models demonstrate the superior effectiveness of the proposed model in solving trade-off problems. The study employs a weighted sum method to select one solution from the set of Pareto-optimal solutions, illustrating the effectiveness of NSGA-III in balancing project timelines and costs. This research offers a robust methodological framework that enhances decision-making in the construction industry, contributing to global sustainable development goals.
引用
收藏
页码:5685 / 5696
页数:11
相关论文
共 50 条
  • [31] Construction time-cost trade-off analysis using ant colony optimization algorithm
    Kuang Ya-ping
    Xiong Ying
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 2039 - 2044
  • [32] Time-cost trade-off optimization with a new initial population approach
    Toğan V.
    Eirgash M.A.
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580
  • [33] Project time-cost trade-off optimization by maximal flow theory
    Liu, JM
    Rahbar, F
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 607 - 609
  • [34] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [35] Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy
    Zou, Haobo
    Zhou, Guohua
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (12) : 1271 - 1281
  • [36] A New Idea to LP Model for Time-cost Trade-off in Networks
    ZHAO Guohao
    JING Shentu and ZHANG Yaguang(Scanxi Institute of Economic Management
    Journal of Systems Science and Systems Engineering, 1995, (03) : 250 - 255
  • [37] AN IMPROVED TIME-COST TRADE-OFF MODEL WITH OPTIMAL LABOR PRODUCTIVITY
    Lin, Chien-Liang
    Lai, Yu-Che
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (02) : 113 - 130
  • [38] Nondominated Archiving Multicolony Ant Algorithm in Time-Cost Trade-Off Optimization
    Afshar, A.
    Ziaraty, A. Kasaeian
    Kaveh, A.
    Sharifi, F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) : 668 - 674
  • [39] Time-cost trade-off in PERT networks using a genetic algorithm
    Azaron, A
    Perkgoz, C
    Kato, K
    Katagiri, H
    Sakawa, M
    2004 47TH MIDWEST SYMPOSIUM ON CIRCUITS AND SYSTEMS, VOL III, CONFERENCE PROCEEDINGS, 2004, : 57 - 60