共 50 条
- [21] A Fuzzy Random Time-Cost Trade-off Model PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 633 - 637
- [22] Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 1295 - 1307
- [26] CBO and CSS Algorithms for Resource Allocation and Time-Cost Trade-Off PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2015, 59 (03): : 361 - 371
- [27] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
- [29] Project time-cost trade-off scheduling: a hybrid optimization approach INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
- [30] Time-Cost Trade-Off Optimization with a New Initial Population Approach TEKNIK DERGI, 2019, 30 (06): : 9561 - 9580